Stand type
Country Pavilion exhibition stands
- Floor area range
- 100-2000 m²
- Build time
- 4-10 days
- Construction
- Purpose-built for the project
In national participation programmes, a pavilion gathers several exhibitors into a single scheme. The design problem differs from that of a single stand: a shared national identity has to be built, yet each company’s name and product must still be visible. A pavilion that loses that balance becomes either an anonymous corridor or a pile of stands drowning each other out. The answer usually lies in a shared superstructure: a fascia, perimeter band or ceiling scheme that gives the whole pavilion its identity sits above, while the company units work with their own surfaces below. The visitor sees the country from a distance and the company on approach. Pavilion projects also differ in timing: the exhibitor list is confirmed late and the number of units can change. So we build the design as a module system to which units can be added or removed. Correspondence with the organising body, regulations and build coordination are our responsibility as well.
Pros and cons
Pros
- Bespoke design
- Freedom in material and detail
- High visual impact
Cons
- Longer production time
- Costs more than system stands
Projects0
No published projects under this heading yet.
Frequently asked
- What floor areas do you build a Country Pavilion stand for?
- We work in the 100-2000 m² range, and 0 published projects on this site are of this type. What decides the layout is not the area but how many sides are open and what you want to show on the walls; we use the same system on a small corner stand and on an island in the middle of the hall.
- How long does a Country Pavilion stand take to build?
- The build in the hall takes 4-10 days; the schedule of the hall matters as much as the size of the stand. Our own crew does the build, and we take the dismantle at closing too.
- How does the process work for a Country Pavilion stand?
- We start with the floor area, the open sides and the fair date, then draw the design. Once it is approved the stand is produced in the workshop and built in the hall to the fair calendar; at closing, our crew dismantles it.