Exhibition stand builders in Hanover

General view of the Emintosun stand at Ligna 2025 in Hanover: a 182 sqm maxima system build.

Taking a stand to Hanover means building in one of the 27 halls of Deutsche Messe, a fairground of 392,453 square metres. We have done it four times: three stands at HANNOVER MESSE and one at LIGNA, all produced in our Beylikdüzü workshop, trucked to Hanover and built by our own crew, with our Aachen office providing support on the German side. You fly in and find the stand ready the day before opening.

What we do at Hanover fairs

Deutsche Messe Hanover, with 392,453 square metres of exhibition space, is the biggest venue we work in. At HANNOVER MESSE we built 36 square metre maxima stands for Öz Metal in 2023 and for Genç Bombe in 2025, and a 35 square metre maxima stand for Tekno Vals in 2022. The 182 square metre maxima stand for Emintosun at LIGNA 2025 is one of the largest system stands we have built in Germany: on a system stand of that size the floor load and the rigging height are planned from the start against the hall management's file. Photographs of all four are on the projects page.

The fairs on the calendar are EuroBLECH 20–23 October 2026, EuroTier 10–13 November 2026, HANNOVER MESSE 5–8 April 2027 and LIGNA 10–14 May 2027. Sheet metal, livestock equipment and industrial companies get the same workflow at all four.

Freight, customs and local support

The stand is trial-assembled in the workshop, then broken down and loaded onto the truck. We arrange the road freight from Turkey to Germany, the customs paperwork and, where needed, the ATA Carnet, and we follow Deutsche Messe's vehicle and build schedule for entry to the hall. Our Aachen office is on hand during the fair; the build crew is our own team from Istanbul. What is and is not included on a job abroad is listed item by item on the international exhibition stand page.

Companies from outside Turkey exhibiting in Hanover use the same route: the stand is produced in Istanbul, the freight and paperwork are ours, and you deal with one contact in English throughout.

Which stand type for Hanover

  • Maxima system: 12–200 square metres, built in the hall in 1–3 days. All four of our Hanover stands are this type; the freight volume is small, the build is quick and the print quality is high, although panel joints remain visible.
  • Custom timber build: 20–500 square metres, 2–5 days to build. For an uninterrupted surface and dimensions drawn for your brand; the freight volume grows, so we open the calendar 8 weeks ahead.
  • Island and corner stands: from 36 square metres, for plots with two open sides.

Fair venues in Hanover

  • Deutsche Messe Hanover
    Halls
    27 halls
    Area
    392,453 m²
    Fairs in calendar
    4 fairs in calendar

    Akros Mimarlık builds turnkey exhibition stands at Deutsche Messe Hanover, produced in its own Beylikdüzü workshop in Istanbul and shipped to the halls. Three HANNOVER MESSE stands so far, for Tekno Vals, Öz Metal and Genç Bombe, all maxima builds; freight, ATA Carnet and customs are ours, with local support from our Aachen office. First concept free.

Upcoming fairs in Hanover

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

October 2026

November 2026

April 2027

May 2027

Working timeline for a fair in Hanover

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types for Hanover fairs

We have 4 published projects at Hanover fairs so far; each card shows how many stands of that type we have built here. All types are produced in our workshop in Beylikdüzü, Istanbul and built by our own crew.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site
    Projects
    4 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site

    Purpose-built timber stand produced from scratch for each show.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 4

All projects

Frequently asked

Which fairs in Hanover have you built at?
HANNOVER MESSE in three separate years and LIGNA once. All on the Deutsche Messe fairground; the projects are on this page.
When should we start for HANNOVER MESSE?
The fair is in April; a design approved by the end of January leaves comfortable time for production and freight. For later starts we check the calendar together first.
Who handles customs and freight?
We do. Export paperwork for the stand, road freight and the ATA Carnet where needed appear as separate lines in the quote. If you are shipping products separately, we can put them on the same truck under our exhibition logistics service.
Can you place heavy machinery on the stand?
Yes. The 182 square metre Emintosun stand at LIGNA 2025 is a job of that scale; the floor load and the machine layout are drawn in the first step of the design and we obtain the approval from the hall management. Give us the weight and dimensions of the machine at the quote stage.
Does your crew come to Germany, and what about the language?
Installation and dismantling are done by our own crew from Istanbul. Our Aachen office provides support on the German side; if a technical question comes up during the fair, we remain your single contact.
When should we start for Hanover?
A comfortable programme starts 8 weeks before the fair; because a maxima system is quicker to produce, a later job can often still be fitted in. Freight days are added to the schedule; if the date is closer than that, we tell you first what can still be done and then run an accelerated programme. Send the fair name and your floor area through the quote form; the first concept is free.

Let us build your stand at your fair in Hanover

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote