Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builders in Dusseldorf

General view of the Eksen Al stand at Aluminium 2025 in Düsseldorf: a 42 sqm maxima system build.

For us Dusseldorf is first of all the aluminium fair. We have built stands for Eksen Al and Alfa Metal at ALUMINIUM Düsseldorf and for Saes at wire & Tube, all produced in Beylikdüzü, trucked to Germany and built by our own crew at Messe Düsseldorf. Our Aachen office is nearby; the support on the German side comes from there and it is on hand in fair week.

What we do at Dusseldorf fairs

We design the stand, submit it for approval as a three-dimensional visual, produce it in the workshop, trial-assemble it and hand it to freight. At Messe Düsseldorf the build, the handover walk and the dismantling are done by our crew. Graphics and print, the electrical plan, the technical file for the hall management: one contract covers all of it.

At ALUMINIUM Düsseldorf 2025 we built a 96 square metre maxima stand for Alfa Metal and a 42 square metre maxima stand for Eksen Al. For Alkor we built a 38 square metre maxima stand, and for Saes a 25 square metre maxima stand at wire & Tube 2024. All of them are on the projects page, and the common solutions behind them are described on our aluminium industry page.

The calendar has ALUMINIUM 6–8 October 2026, MEDICA 16–19 November 2026 and wire & Tube 3–7 April 2028. Medical companies at MEDICA get the same workflow, in maxima or in timber.

Freight, customs and local support

We arrange the road freight, the export paperwork and the ATA Carnet where needed; each appears as a separate line in the quote. Vehicle access hours and the build schedule at Messe Düsseldorf arrive with the organiser's file, and we follow that file. Our Aachen office is on site in fair week. If you ship products separately, we put them on the same truck as the stand under our exhibition logistics service, so one consignment clears customs instead of two.

Exhibitors from outside Turkey get the same route: the stand is produced in Istanbul, the freight and paperwork are ours, and you have one contact in English from the first drawing to the dismantling.

Which stand type for Dusseldorf

  • Maxima system: 12–200 square metres, 1–3 days to build. All of our Dusseldorf stands are this type: aluminium profile grid, printed panels, quick build.
  • Custom timber build: 20–500 square metres, 2–5 days to build. For an uninterrupted surface and bespoke dimensions; the freight volume grows, so we start 8 weeks ahead.
  • Double-decker stand: from 60 square metres, 4–8 days to build; for companies that want a meeting room upstairs, subject to the hall management's structural approval.

Fair venues in Dusseldorf

  • Messe Düsseldorf
    Fairs in calendar
    3 fairs in calendar

    Akros Mimarlık builds exhibition stands at Messe Düsseldorf for companies exhibiting from Turkey, delivered turnkey with customs handled by us. Each stand is produced in our Beylikdüzü workshop, shipped under ATA Carnet and built by our own crew with support from our Aachen office; the maxima stand for Saes at wire & Tube is our work here. First concept free.

Upcoming fairs in Dusseldorf

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

November 2026

April 2028

Working timeline for a fair in Dusseldorf

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types for Dusseldorf fairs

We have 4 published projects at Dusseldorf fairs so far; each card shows how many stands of that type we have built here. All types are produced in our workshop in Beylikdüzü, Istanbul and built by our own crew.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site
    Projects
    3 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site
    Projects
    1 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 4

All projects

Frequently asked

Which fairs at Messe Düsseldorf have you built at?
wire & Tube and ALUMINIUM. Most of our aluminium-sector work is in these halls; the projects are on this page.
How does the stand get to Düsseldorf?
By truck from Istanbul under an ATA Carnet. We are in Düsseldorf the day before move-in, and our own crew does the build.
Is it too late for ALUMINIUM 2026?
The fair runs 6–8 October 2026; a maxima stand can still be done on an accelerated programme. Put the fair name, your floor area and the number of open sides into the quote form and within 48 hours we tell you in writing what is possible.
Can you hang aluminium profiles and heavy samples on the stand?
Yes. At aluminium fairs we draw vertical fixings for profile samples and floor plinths for heavy pieces. Give us the weight and length of the samples in the quote request; we draw the fixings and the plinths accordingly.
Who builds the stand and who handles the German correspondence?
Building and dismantling are done by our own crew from Istanbul. Our Aachen office provides the support on the German side. You talk to one contact throughout.
What do you need from us for the customs paperwork?
Your company details and a list of the products travelling on the stand. We prepare the stand's own paperwork and freight; the invoice and packing list for your products are filled in together with you.

Let us build your stand at your fair in Dusseldorf

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries