How to choose a stand builder

What to look at when comparing quotes: scope in writing, who will actually be on site, whether the references check out and what the contract says about dates.

General view of the stand from the aisle: white body, niches clad with product graphics, and the timber vaulted ceiling of the Messe Karlsruhe hall.
1–10
days on-site installation

Source: Stand types

01

Comparing the quotes

Questions to ask a stand builder and why each one matters
Question to askWhy it matters
Is design included?If concept work is billed separately the rate looks cheaper than it is
Are install and dismantle included?If dismantling is a separate line an unexpected invoice arrives after the fair
Who is responsible on site?If no name is written down, nobody owns the problem at 7am
Who handles freight and customs?Abroad, the ATA carnet and the shipping window drive the schedule
Who prepares the artwork files?Print preparation is a job of its own; put the owner in writing
Is the approved visual an annex?If it is not, you have nothing to point at when the build drifts
Is storage offered, and at what cost?For a reusable system, storage is an annual item
What is the payment schedule?Be careful with a quote asking for the full amount before production
What happens if it is late?Fair dates do not move; the contract needs a delay clause

02

Verifying the references

  1. 01

    Ask for the fair and the year

    A company name is not enough. Which fair, which year, how many square metres. Those three can be verified with a single email.

  2. 02

    Ask who owns the image

    If a stand exists as both a 3D visual and a site photograph, it was built. Ask questions about a reference shown only as a render.

  3. 03

    Write to the exhibitor

    Ask the fair manager at the reference company one question: was the stand ready on install day, and if not, how long did it take.

  4. 04

    Visit the workshop

    See where production happens if you can. Watching who builds the work tells you more than reading another quote.

Is taking the cheapest quote wrong?
For a fair abroad, a local builder or one from Turkey?
How many quotes are enough?

Do you have your fair dates?

The fair name, dates, floor area and number of open sides are enough. We come back within two working days with a concept and a budget range.