Trade fair preparation checklist

What happens, in order, from six months out to the day of the dismantle: space booking, technical regulations, design approval, production, freight and install.

General view of the Yeniler Etiket stand at Eurasia Packaging 2025: a green brand fascia on a dark body, timber display niches and an illuminated welcome counter.
1–10
days on-site installation

Source: Stand types

01

From six months to four weeks

  1. 01

    Six months out

    Space application and position. Ask the organiser for the floor plan; the difference between in-line, corner and island lands on the budget before design starts.

  2. 02

    Four months out

    Read the technical regulations. Height limits, rigging permission, floor loading and power capacity come out here. If a second storey is in mind, ask about permission now.

  3. 03

    Three months out

    Brief and concept direction. The goal is settled: new customers, meetings with existing ones, or a product launch. The floor plan follows from it.

  4. 04

    Eight weeks out

    Design approval and contract. The approved 3D visual is an annex to the contract; layout changes after this date carry a cost.

  5. 05

    Four weeks out

    Production and printed graphics. Files are delivered to the brand guidelines. A logo or strapline change after this point means reprinting.

  6. 06

    One week out

    Freight and customs. For work abroad the ATA carnet and the shipping window close this week. Products and samples go in the same consignment.

  7. 07

    Install and dismantle

    On-site installation takes 1–10 days by stand type. Dismantling starts in the last hour of the fair; reusable parts are numbered and returned to storage.

02

The week of the fair

Timing, task and responsibility across the preparation
TimingTaskOwner
Six months outSpace application, position and open sidesExhibitor
Four months outTechnical regulations and constraintsAkros
Three months outBrief, goal and concept directionBoth
Eight weeks outDesign approval and contractBoth
Four weeks outProduction, artwork files and printingAkros
Two weeks outList of products, samples and literatureExhibitor
One week outFreight, ATA carnet and customsAkros
InstallationOn-site build, power and graphics checkAkros
Fair daysShifts, conversation records and stockExhibitor
DismantleDemounting, numbering and storageAkros
How many months ahead should we start?
Who reads the technical regulations?
Can products and samples travel with the stand?

Do you have your fair dates?

The fair name, dates, floor area and number of open sides are enough. We come back within two working days with a concept and a budget range.