Skip to content
Akros Mimarlık
TR

Sustainable stands

Design for dismantling, separable materials, smaller freight volume and less waste in the hall. We do not claim what we cannot measure.

Visualisation of the central meeting area with two screens, a timber slat wall and display plinths.
1–10
days on-site installation

Source: Stand types

01

Design for dismantling

02

Material, freight and waste

  1. 01

    Separate the structure

    Keep the structure and the surface cladding as two layers. At dismantling the two come apart without damage and the materials are sorted by type.

  2. 02

    Keep dimensions standard

    Standard panel and profile sizes cut the cutting waste and the number of parts. Every bespoke dimension adds waste and production time.

  3. 03

    Choose mechanical fixings

    Screws and clips beat glue and filler. What comes apart can be separated, and what is separated can be recovered.

  4. 04

    Shrink the freight volume

    Flat-packed parts mean fewer lorries. Volume, more than weight, drives the freight price and the handling on site.

  5. 05

    Keep graphics independent

    Fix the printed surface independently of the structure. A change of visual before the fair means reprinting that panel only, not touching the rest of the stand.

  6. 06

    Write the dismantle plan

    How the stand comes apart and how the materials are sorted is settled at design stage. An unplanned dismantle is rushed, and rushed dismantles make waste.

Does a sustainable stand cost more?
Do you publish a carbon figure or a certificate?

Do you have your fair dates?

The fair name, dates, floor area and number of open sides are enough. We come back within two working days with a concept and a budget range.

Get a quoteContact us