Exhibition stand guide

How an exhibition stand is built: twelve steps from brief to dismantling

Lokman Türkoğlu · Founder & Head of Design · 3 min read · Last updated:

View from the open side of the stand: a video wall beneath the İBA Kimya fascia, with a welcome counter and planting in front of it.

Short answer

How is an exhibition stand built?

An exhibition stand starts with the brief: fair, date, plot size, number of open sides, the products to be shown and the meeting need are written down. The organiser’s manual is read, the concept is presented as a 3D visual, and after approval a dimensioned technical drawing and an itemised quote are prepared. Production happens in the workshop: timber parts are cut, painted, fully assembled and checked; aluminium profiles are cut to size; graphics go to print. Paperwork goes to the organiser, parts are loaded in order, our own crew builds in the hall and dismantles when the fair closes. A six-week calendar for a domestic fair and eight weeks for one abroad runs comfortably.

The reasoning follows below, section by section

Sources