Build-up and dismantling

How the build window opens, how vehicles and staff are registered, how the stand's power is switched on, what the handover record says and what happens on dismantling night. Venue rules, penalties and what the exhibitor has to do.

01

The build window and entry

02

Build day: order and checks

  1. 01

    Plot check

    Plot size, corner points, columns and service hatches are compared with the floor plan; hatches and duct openings must stay accessible at all times.

  2. 02

    Floor and frame

    The pre-prepared floor covering is laid (carpet with double-sided tape, no screws into the floor), the structural frame goes up and anti-tipping weights are placed.

  3. 03

    Power and lighting

    The MYK-certified electrician installs the wiring to the project, connects the board with its residual current device and signs the compliance form; the venue's electrical unit switches the line on. LED fittings are mounted.

  4. 04

    Surfaces, graphics, furniture

    Wall surfaces and graphic panels are fitted, lightboxes connected, furniture and showcases placed, products unpacked. The fire extinguisher (one per 50 m²) goes in a visible spot.

  5. 05

    Cleaning and handover

    Packaging and waste leave the hall, empties go to the forwarder, the stand is cleaned. The exhibitor checks the stand against the drawing and signs the handover record, at least a day before opening.

2 hours
time allowed to remove waste from the hall during build-up; a per-cubic-metre penalty beyond it (Tüyap)

Source: Tüyap prohibitions (MAKTEK 2026)

5 times
penalty for every hole drilled into floor or wall, as a multiple of the stand's square-metre sale price (Tüyap)

Source: Tüyap prohibitions (MAKTEK 2026)

We read the technical manual so you do not have to

We submit the stand project to the organiser together with the engineer's approval, the electrical load declaration and the fire certificates. The crew entering the hall on build day is registered, certified and has worked in that venue before.

Request a quoteProduction and build service

03

During the fair

04

Dismantling night

05

Frequently asked questions

Do we need to be present during build-up?
Can the build run overnight?
Can we pack up half a day early before the fair ends?
What happens to the stand after dismantling?

If your fair date is set, the countdown has started

The stand calendar starts the day the plot contract is signed. Send the fair name, date and plot size; within two business days we come back with a concept visual and an itemised quote. Asking for a quote commits you to nothing.

Request a quoteTalk to us first