Skip to content
Akros Mimarlık
TR

Trade fair budget and cost items

The budget of a fair participation has nine items; most companies plan only two of them (space rental and the stand). We explain what varies in each item, which extra fees the organiser charges and which items state support covers. No figures, because every fair differs; a method instead.

01

The nine items

The nine items of a fair budget and their support status
ItemWhat it coversWhat it depends onSupport
1. Space rental and organiser feesPlot rental, registration/media fee, waste and cleaning charge, catalogue entry, association levy such as AUMA (Germany)Square metres, plot type (row/corner/island), early booking, prestige of the fairDomestic and abroad: yes (space rental)
2. Stand design and productionConcept, technical drawing, frame, surfaces, lighting, furniture, build and dismantling labourStand type (system, modular, custom timber), height and decks, number of open sidesYes: design, construction, build, shelving, lighting, carpet, table, chair (Decision art. 8)
3. Graphics and printPrinted panels, tension fabric, lightboxes, film, digital screen contentSquare metres, technique (backlit fabric the most expensive), number of design revisionsAssessed within the stand expense
4. Freight and customsStand and product freight, on-site handling, empties storage, customs broker, ATA Carnet guaranteeDistance, number of vehicles, part size, country, product weightAbroad: the support base takes freight into account (Circular art. 4)
5. Travel and accommodationFlights, transfers, hotel, visa, daily allowanceHeadcount, fair duration, city (hotel rates multiply in fair week)No, for the exhibitor
6. Stand staffYour own team's time, hostess/interpreter, training, clothingFair duration, language needs, number of shiftsNo
7. PromotionInvitations, pre-fair e-mail, social media, catalogue, samples, hospitalityTarget visitor count, product typeNo, for the exhibitor (organiser promotion is separate)
8. InsuranceTransit insurance, exhibited goods insurance, third-party liabilityGoods value, country, scope of the organiser's policyNo
9. ContingencyExtra power, night build, missing material, penalties (floor screws, waste), last-minute printPlanning quality; a good brief shrinks this itemNo

02

The organiser's invisible items

Let us set up your support file correctly from the start

We issue the quote and invoice with the line breakdown the Ministry of Trade asks for: design, construction, build, lighting and furniture on separate lines. The stand expense statement, hall photographs and handover record go into your file complete.

Request a quoteAsk a support question

03

Payment rules and support

04

How to compare quotes

05

Frequently asked questions

Which is the largest budget item?
Will you give a price per square metre if we ask?
How should the stand builder's invoice look for support?
How much should we set aside for contingency?

If your fair date is set, the countdown has started

The stand calendar starts the day the plot contract is signed. Send the fair name, date and plot size; within two business days we come back with a concept visual and an itemised quote. Asking for a quote commits you to nothing.

Request a quoteTalk to us first