Venue rules and stand approval

Every venue has technical regulations, and a stand that does not comply does not enter the hall. Tüyap's stand rules in force since 1 March 2026, height and deck approvals, power and fire requirements, and how German venues differ.

01

Tüyap 2026: stand structure rules

02

Stand approval: who signs, when it is submitted

4 m
single-storey stands above this height and all double-deck stands need a licensed civil engineer's approval (Tüyap)

Source: Tüyap stand technical rules

1 per 50 m²
mandatory 6 kg fire extinguishers on the stand during build-up and the fair

Source: Tüyap stand technical rules

5 t/m²
maximum floor load in Tüyap halls 1–10; 3 t/m² in halls 11–12

Source: Tüyap floor plan notes

We read the technical manual so you do not have to

We submit the stand project to the organiser together with the engineer's approval, the electrical load declaration and the fire certificates. The crew entering the hall on build day is registered, certified and has worked in that venue before.

Request a quoteProduction and build service

03

Power, fire and occupational safety

04

What differs at German venues

05

Frequently asked questions

Who submits the stand project to the organiser?
Can we not have a timber stand on a 24 square metre plot?
What if the neighbouring stand is taller than ours?
Can we build the stand with our own staff?