Installation and logistics

Problems on site and how fast they are solved

Ömer Faruk Süer · Senior Sales Manager · 3 min read · Last updated:

The welcome desk and the closed storeroom wall behind it; two Er Bakır representatives are waiting at the desk.

Short answer

Which problems come up most during a build?

Five repeat: the delivery slot slipping, mains power arriving late, a neighbour overrunning the shared wall line, a column that is not the size the drawing showed, and a surface damaged in transit. Any of them can push the build back a day. How fast they clear depends on the spares the crew carries, the relationship with local suppliers, and whether it is already settled who makes the call.

The reasoning follows below, section by section