Skip to content
Akros Mimarlık
TR

Stand type

Custom Timber Build exhibition stands

The Er Bakır stand built in the Atlanta fair hall: timber-slatted columns, a dark canopy, two screens and branded display plinths.

We recommend a custom timber build when you want the stand drawn around your brand rather than around the grid of a system. No visible joints on the walls, rounded corners, a heavy product fixed to a wall, a ceiling that goes right up to the limit the hall allows: all of that is possible with a timber frame cut and painted in our own workshop. We work with the same method from a 20 square metre corner to a 500 square metre island.

How we produce it in the workshop

Once the design is approved we turn the three-dimensional model into production drawings; every wall, counter and plinth is made piece by piece in our own workshop in Beylikdüzü. The frame is timber; the surface is painted MDF, laminate, veneer or fabric, depending on the design. Lighting channels, cable routes and sockets sit behind the surface; in the hall you see only the design.

Graphics and print are ours as well, applied to the timber panels in the workshop. Whether the logo is backlit, the lettering is cut in relief or a whole wall becomes an image is settled during the design stage, not discovered in the hall.

A week before the fair the stand has a trial assembly in the workshop: lights on, doors opened and closed, furniture in place. Then the parts are numbered and shipped; the build in the hall takes 2 to 5 days.

Where we have used it

In Istanbul, the Yeniler Etiket stand at Eurasia Packaging 2025 was 100 square metres and the Solinved stand at SolarEX 2025 was 110, both custom timber. Abroad we built 100 square metres for İBA Kimya at PaintExpo 2024 in Karlsruhe, 54 for Er Bakır at Interwire 2025 in Atlanta and 105 for Cemer Kent Ekipmanları at FSB Cologne. The method scales down too: the Doqu Home stand at imm cologne 2023 was 28 square metres. All of them are on the projects page.

What we pay attention to

  • Height: every hall has its own rule for stand height and the back wall facing the neighbour; we send the technical file and draw to that limit.
  • Heavy products: if a machine, panel or sample is going on a wall, the structure is calculated in the first drawing, with a steel reinforcement behind the timber frame where needed.
  • Lighting: general light and product spots run on separate circuits, and nothing ships before the lighting test at the trial assembly.
  • Furniture: the meeting table, counter, lockable cupboard and kitchen worktop are in the production drawings; nothing is left to source in the hall.
  • Floor: carpet, laminate or a raised platform is decided with the cable routing.

What a timber exhibition stand is

A timber exhibition stand is built from scratch in the workshop for that fair and that plot: a wooden frame with surfaces in painted MDF, laminate, veneer or fabric, depending on the design. Unlike a system stand it is not tied to a profile catalogue; curved walls, concealed lighting channels, raised logos and made-to-measure display cases are solved in timber. Which board goes where is explained in our timber panel selection article.

One distinction is worth making: a search for “wooden stand” also brings up retail display racks and tabletop holders. This page is about the exhibition stand — the structure built for your brand in the hall, the one visitors walk into. We describe the whole process step by step in our custom timber stand article.

Timber exhibition stands we have built

All of the following were built as custom timber stands; each page carries the fair, the city, the floor area and photographs taken in the hall.

From thirty-six to one hundred and ten square metres, from Istanbul to Cologne, Karlsruhe and Atlanta, all from the same workshop; the full list is in the projects section at the bottom of this page.

What determines the price of a timber stand

We do not quote a single per-square-metre price; on a timber stand the budget is set by these items: metres of wall and their height, the share of curved versus flat surfaces, painted MDF or veneer, the number of enclosed volumes (storage, kitchen, meeting room), hanging sign and LED, the amount of furniture, and the city of the fair. Compared with a system stand the difference shows in the production line: every part is made for that stand, so workshop time is longer.

These items are written separately in the quote, so you can see how the budget changes when one is removed. We explain all of them on the exhibition stand costs page. Tell us the fair and your floor area and we send a written budget frame within 48 hours; the first concept is free.

What free form costs

The one real advantage of a timber stand is that it carries no dimensional constraint. A wall can be two metres twenty or three metres forty; curves, steps, recessed niches, an asymmetric ceiling — if it can be drawn it can be made. In a modular system each of those is rounded to the profile grid.

The cost shows up in three places. Production takes longer, because every part is made once and has no prototype. The site build takes longer, because parts are joined in position and need touching up. After the show most parts are damaged in the strip-out; reuse is usually limited to furniture and display cases.

Decided with those three known in advance, a timber stand is not expensive but correctly priced. Our stand design page sets out the steps from drawing to production.

Heavy exhibits and the platform

Machinery, generators and workbenches usually make timber compulsory. The reason is structural, not aesthetic. Platform joists are sized for the point load, reinforcement goes under the footprint, and cable and air lines run inside the floor.

Modular system podiums are built for a stated distributed load. Putting a one-and-a-half-tonne machine on one, without the manufacturer signing it off, transfers the risk to you. Organisers also publish a floor loading limit per hall; the lower of the two limits applies.

Share the weight and footprint when you ask for a quote. Learning the load afterwards means redrawing a stand that has already been drawn.

When it is the wrong call

If you do three or more fairs a year at similar sizes, a timber stand means starting the cost from zero every time. A modular system bought with the same money leaves only graphics and freight from the second show onwards.

Abroad, freight volume also moves the decision. Timber parts are bulky and fill most of a trailer; the same stand can travel in half the space as a modular system. On a distant fair the freight difference can close the gap between types.

Then there is the calendar. Timber does not tolerate a late design approval; workshop queue and drying times cannot be compressed. If the design is still being argued six weeks out, timber is not the answer.

Custom Timber Build: cities we have built in

Our published projects of this type were built in the cities below; every stand was produced in our workshop in Beylikdüzü, Istanbul and built by our own crew. The city name opens that city's fairs and rules.

Pros and cons

Pros

  • Bespoke design
  • Freedom in material and detail
  • High visual impact

Cons

  • Longer production time
  • Costs more than system stands

Projects 13

All projects

Frequently asked

Custom timber or a system stand?
In a system stand the load-bearing grid is fixed; dimensions follow that grid and the build is quick. A custom timber stand is drawn for your brand instead — panel sizes and niche depths belong to the project, and production happens in the workshop. The difference shows on wide surfaces: system panel joints stay readable, while a purpose-built surface runs uninterrupted.
What floor areas do you build a Custom Timber Build stand for?
We work in the 20-500 m² range, and 13 published projects on this site are of this type. What decides the layout is not the area but how many sides are open and what you want to show on the walls; we use the same system on a small corner stand and on an island in the middle of the hall.
How long does a Custom Timber Build stand take to build?
The build in the hall takes 2-5 days; the schedule of the hall matters as much as the size of the stand. Our own crew does the build, and we take the dismantle at closing too.
How does the process work for a Custom Timber Build stand?
We start with the floor area, the open sides and the fair date, then draw the design. Once it is approved the stand is produced in the workshop and built in the hall to the fair calendar; at closing, our crew dismantles it.
How far ahead of the fair should we start on a timber stand?
A comfortable schedule is 8 weeks: design approval and technical file at 6 weeks, workshop production and print files at 4 weeks, trial assembly and shipping at 1 week. If a job comes in later we say what the calendar still allows, then run an accelerated programme.
Can you take a timber stand to a fair abroad?
Yes. The timber stands we built in Cologne, Karlsruhe, Moscow and Atlanta left from Beylikdüzü. Freight, the ATA Carnet and customs are handled by us; at German fairs our Aachen office gives local support on the German side.
Can you fix a heavy machine or a large sample to the stand?
We can; we need the weight and dimensions at the quote stage. The frame behind the wall is drawn accordingly and the load is tested at the trial assembly.
Who builds and dismantles the stand?
Our own crew. The parts arrive in the hall numbered; we walk the stand together the day before opening. At the close of the fair we dismantle it as well.
What should we send for a quote?
The fair name and dates, your floor area, the number of open sides and a floor plan if you have one. A list of the products you will show, with the weight of any heavy ones, shortens the design work. The quote form is here; the first concept is free and we reply within 48 hours.
What is a timber exhibition stand?
A stand built from scratch in the workshop for that fair and that plot; a wooden frame with surfaces in painted MDF, laminate, veneer or fabric depending on the design. Because it is not tied to a profile catalogue, curved walls, concealed lighting and made-to-measure display cases are done in timber. We produce it in our Beylikdüzü workshop, do a trial build a week before the fair and hand it over in the hall in two to five days.
How much does a timber exhibition stand cost?
We do not give a single figure; the price is set by metres of wall and their height, the share of curved surfaces, painted MDF or veneer, the number of enclosed volumes and pieces of furniture, and the city of the fair. We write these as separate lines in the quote. Tell us the fair and your floor area and we send a written budget frame within 48 hours; the first concept is free.
Is a wooden display stand the same as a timber exhibition stand?
No. A search for “wooden stand” also returns retail display racks, tabletop holders and product stands; those are ready-made products that are manufactured and sold. A timber exhibition stand is the structure built for your brand in the fair hall, the one visitors walk into, and it is designed for that plot every time. We build the latter.
Where can we see examples of timber stands?
The projects section at the bottom of this page shows custom timber stands we built, photographed in the hall; each record lists the fair, city, floor area and year. You will find examples from fairs in Istanbul, Ankara, Cologne, Karlsruhe and Atlanta. You are also welcome to see the trial build we do a week before the fair in person at our Beylikdüzü workshop.
Can a timber stand be used at a second fair?
Partly. Display cases, counters, furniture and some wall panels travel. The structure and floor platform rarely fit the dimensions of the next space.
Which panel is used in a timber stand?
It depends on the surface: MDF for painted faces, plywood where load is carried, melamine board for faced surfaces. The venue’s required fire class narrows the choice.

Other stand types