Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builders in Ankara

General view of the Pcs Test stand at the fair 2025 in Istanbul: a 36 sqm custom timber build.

If you are exhibiting in Ankara the stand comes to you from Istanbul, and the only visible consequence for you is one freight day in the schedule. We produce the stand in our Beylikdüzü workshop, assemble it once with a lighting test before it ships, bring it to Ankara by road and build it at ATO Congresium with our own crew. The 36 square metre timber stand for Pcs Test went exactly that way.

What we do at Ankara fairs

ATO Congresium is the venue we work in; the calendar has the Kalite Quality Fair 4–7 November 2026. For test and measurement equipment, defence suppliers, machinery and companies selling to public tenders the stand follows the same workflow: the fair name, floor area and number of open sides come in, we send the first concept as a three-dimensional visual within 48 hours, and after approval we submit the technical file to the hall management, produce in the workshop and handle graphics and print.

On a test equipment stand we set up a layout where the instruments are shown in working order, so a bench at the right height for desktop equipment, sockets and lighting go into the plan from the start. The stand is on the projects page, and the test equipment industry page describes what we watch for in this kind of job. Defence suppliers have their own defence page.

Freight from Istanbul and the build

The stand leaves the workshop broken down and loaded on the truck; the build crew is in Ankara the same day. Vehicle access and build hours at ATO Congresium arrive with the organiser's file, and we follow that file and obtain the technical approval. Your products can travel on the same truck if you wish; the details are on the exhibition logistics page. We walk the stand together the day before opening and hand it over with a written guarantee; when the fair closes we dismantle it as well.

Exhibitors from outside Turkey get the same service in Ankara: one contract, one contact in English, our crew in the hall.

Which stand type for Ankara

  • Custom timber build: 20–500 square metres, 2–5 days to build in the hall. The Pcs Test stand is this type; for jobs that need an uninterrupted surface.
  • Maxima system: 12–200 square metres, 1–3 days to build. For tight calendars or small plots, with a small freight volume.
  • Modular stand: 9–150 square metres, 1–2 days to build; for short exhibitions in a congress centre.

Fair venues in Ankara

  • ATO Congresium
    Fairs in calendar
    1 fairs in calendar

    Akros Mimarlık builds turnkey exhibition stands for the fairs at ATO Congresium in Ankara, produced in its own workshop near Istanbul. The 36 square metre timber stand for Pcs Test shows our work in the test equipment sector; our own crew builds and dismantles in the hall. First concept free, written budget in three options.

Upcoming fairs in Ankara

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

November 2026

Working timeline for a fair in Ankara

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly and lighting test in the workshop, dispatch

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Dispatch from the workshop to the hall
What goes into exhibition stand pricing

Our stand types for Ankara fairs

We have 1 published projects at Ankara fairs so far; each card shows how many stands of that type we have built here. All types are produced in our workshop in Beylikdüzü, Istanbul and built by our own crew.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site
    Projects
    1 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 1

All projects

Frequently asked

Do you build at the fair venues in Ankara?
Yes: ATO Congresium. Hall rules vary by fair; we submit the technical file to the organiser.
When should a stand for Ankara be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Can we get a quote for the upcoming fairs in Ankara?
Yes. The link next to each fair in the calendar opens a quote form with the fair name and dates already filled in; add the floor area and stand type and send it.
When should we start for a fair in Ankara?
Starting 8 weeks before the fair gives a comfortable schedule with the freight day included, and the same 8 weeks is the measure for the Kalite Quality Fair in November. If a job comes in later we first tell you what can still be done, then run an accelerated programme.
Does your crew come to Ankara?
Yes. Building and dismantling are done by our own crew from Istanbul. During the fair you reach us by phone for any fault or extra need.
Can we show our instruments in working order?
Yes. Give us the number of instruments, their dimensions and their power needs in the quote request; we draw the bench height, the number of sockets and the lighting to match. We file the electrical application with the hall management.
What should we send for a quote?
The fair name and dates, the floor area in square metres and the number of open sides, plus a floor plan if you have one. Put it into the quote form; the first concept is free, the budget frame comes in three options and the scope is written item by item.

Let us build your stand at your fair in Ankara

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries