Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builders in Cologne

The Cemer Kent Ekipmanları stand: a spherical climbing unit set on sand, a world-map brand wall behind it and meeting tables in front.

A company that comes to us for a stand in Cologne is working in a fair city close to our Aachen office. At Koelnmesse we built a 28 square metre timber stand for Doqu Home at imm cologne 2023 and a 105 square metre timber stand for Cemer Kent Ekipmanları at FSB Cologne; both were produced in our Beylikdüzü workshop, trucked to Cologne and built and dismantled by our own crew. For furniture and playground equipment, where the product itself is the exhibit, we recommend a timber build: the product becomes part of the stand.

What we do at Cologne fairs

Koelnmesse has 11 halls and 284,000 square metres. The calendar here runs ORGATEC 27–30 October 2026, imm cologne 19–22 January 2027, Anuga FoodTec 23–26 February 2027, interzum 11–14 May 2027, Anuga 9–13 October 2027 and FSB Cologne 26–29 October 2027. Furniture, office furniture, furniture fittings, food and sports facility companies all get the same workflow: we design the stand, submit a three-dimensional visual for approval, produce it in the workshop, trial-assemble it, hand it to freight and build it in the hall.

In furniture and playground equipment jobs the product is the exhibit; we keep the walls and floor to a plain surface that lets the product stand out and point the lighting at it. For heavy equipment the floor load and the assembly sequence are planned against Koelnmesse's technical file. Both are on the projects page with photographs; the industry pages are furniture and playground equipment.

Freight, customs and local support

We arrange the road freight, the export paperwork and the ATA Carnet where needed, each as a separate line in the quote. Koelnmesse's vehicle access and build hours come with the organiser's file; we follow the file and obtain the technical approval. Our Aachen office provides support on the German side during build and fair week. Your products can travel on the same truck as the stand; the details are on the exhibition logistics page.

Exhibitors from outside Turkey are welcome on the same route: the stand is produced in Istanbul, freight and paperwork are ours, and you deal with one contact in English from the first drawing to the dismantling.

Which stand type for Cologne

  • Custom timber build: 20–500 square metres, 2–5 days to build. Both of our Cologne stands are this type; for furniture and equipment on show we want an uninterrupted surface.
  • Maxima system: 12–200 square metres, 1–3 days to build. For tight calendars and the smaller plots at the food fairs.
  • Island and corner stands: from 36 square metres; on open-sided plots at imm cologne we turn the product towards the aisle.

Fair venues in Cologne

  • Koelnmesse
    Halls
    11 halls
    Area
    284,000 m²
    Fairs in calendar
    6 fairs in calendar

    Akros Mimarlık builds turnkey exhibition stands at Koelnmesse, produced in its own Istanbul workshop and shipped to Cologne with customs included. Our 105 square metre timber stand for Cemer Kent Ekipmanları at FSB Cologne was built here; one contract covers imm cologne, interzum and ORGATEC, freight and ATA Carnet included. First concept free.

Upcoming fairs in Cologne

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

October 2026

January 2027

February 2027

May 2027

October 2027

Working timeline for a fair in Cologne

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types for Cologne fairs

We have 2 published projects at Cologne fairs so far; each card shows how many stands of that type we have built here. All types are produced in our workshop in Beylikdüzü, Istanbul and built by our own crew.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site
    Projects
    2 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 2

All projects

Frequently asked

Do you build at the fair venues in Cologne?
Yes: Koelnmesse. Hall rules vary by fair; we submit the technical file to the organiser.
When should a stand for Cologne be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Can we get a quote for the upcoming fairs in Cologne?
Yes. The link next to each fair in the calendar opens a quote form with the fair name and dates already filled in; add the floor area and stand type and send it.
Do you place our furniture on the stand?
Yes. Your products travel on the same truck as the stand and, once the build is finished, we position them where the plan shows. If you do not like a position during the handover walk, we move it that day.
When should we start for Cologne?
For a timber stand, 8 weeks before the fair: design approval at 6 weeks, workshop production at 4 weeks, trial assembly and shipping at 1 week. For imm cologne in January, starting in November gives a comfortable schedule.
Who deals with a problem at customs?
We do. The stand's paperwork is prepared by us; the invoice and packing list for your products are prepared together with you. On the German side our Aachen office provides support.
How will we know the hall rules?
You do not need to. Koelnmesse's height limit, rigging rule, electrical and fire requirements are in the technical file; we read the file, draw the stand to match and obtain the approval. All you need to put into the quote form is the fair name and your floor area.

Let us build your stand at your fair in Cologne

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries