Skip to content
Akros Mimarlık
TR

Venues

Stands at Dubai World Trade Centre

Ömer Faruk Süer · Senior Sales Manager · 3 min read · Last updated:

Visualisation from the opposite corner: bar-stool counter, green wall detail and the brand fascia on the ceiling beam.

Short answer

What should you prepare for a stand build in Dubai?

Three files run in parallel. First the approval file: stand drawings, material information, electrical load and contractor notification, submitted by the date in the venue’s manual, with extra approval for double-decker structures. Second customs and freight: sea takes weeks, air takes days, and the choice sets the production calendar. Third the climate: high heat and humidity affect materials, adhesives and print. The dates and values are published in the manual for that show and reissued each edition.

The reasoning follows below, section by section

Sources

Is your question bigger than this article? Send the fair name and floor size; we reply within two working days.

Get a quote
Stands at Dubai World Trade Centre