Building a stand at Tüyap Beylikdüzü

Ömer Faruk Süer · Senior Sales Manager · 3 min read · Last updated:

The stand seen from the opposite corner: timber shelf niches, planting and the illuminated counter in the centre.

Short answer

How is a stand build planned at Tüyap?

The planning runs in three files. First the approval file: stand drawings, the declared electrical load and the contractor list go to the organiser by the date in the manual. Second the build window: the time the venue allows for that particular fair governs vehicle access, loading order and what can be done on site. Third tear-down: the hour the hall must be clear is known from the start and the freight is built around it. All the actual values are published in the technical manual for that show and reissued each edition.

The reasoning follows below, section by section