Short answer

What matters when exhibiting a heavy machine?

Four headings. First the floor: what each hall carries differs and depends on whether it is a basement, an intermediate level or ground level, with the conditions published in the technical manual. Second load spreading: a machine with a high point load may need plates or reinforcement. Third the route: which door the exhibit enters by and with what equipment is planned in advance. Fourth sequence: the heavy item goes into position before the stand is built, and the structure goes up around it.