Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builder in Doha

The question we hear most from companies heading to Doha is whether bringing a stand from Turkey is realistic. It is. The stand is produced in our workshop in Beylikdüzü, shipped to Qatar by sea or air and built in the hall by our own crew. Customs, the ATA Carnet and the correspondence with the organiser are ours; you arrive with your products.

What we do at Doha fairs

Whichever venue in Doha you are booked into, the order of work is the same: brief, three-dimensional concept, written budget, design approval, the organiser's technical file, workshop production, trial assembly, freight, build-up, handover and dismantling. Rules on stand height, closed walls and materials vary from one fair to the next; we read them at the technical file stage and draw the stand to fit. Graphics and print come from our workshop, and the furniture and lighting travel with the stand.

We do not yet have a published project page from Doha. For our work abroad see the Er Bakır stand at Interwire 2025 in Atlanta and the İba Kimya stand at PaintExpo 2024 in Karlsruhe. Our Gulf routine is described on the Dubai and Abu Dhabi pages; Doha jobs use the same shipping route and the same crew. The Qatar page covers the country as a whole.

Freight, customs and local support

A stand does not travel to Qatar by road; we choose sea or air freight according to the schedule and the volume of the stand. Sea freight needs an earlier departure, so for Doha we bring production forward compared with a European fair and write the shipping date into the schedule from the start. We issue the ATA Carnet for temporary import, follow the exit from Turkey and the entry into Qatar, and bring the dismantled stand back on the same document after the fair. We know how timber and surface finishes behave in a hot climate and choose materials accordingly. The full process outside Turkey is on the international stand page, and the freight steps are on the exhibition logistics page.

Which stand type for Doha

  • Custom timber build: uninterrupted surfaces, dimensions drawn for your brand, workshop production; 2–5 days of build-up in the hall.
  • Maxima system: aluminium grid with printed panels; light enough to make air freight worthwhile, built in 1–3 days.
  • Country pavilion: when several Turkish companies exhibit together on a shared plot.

Send the fair name and dates, your floor area and the number of open sides through the quote form; within 48 hours you receive a free first concept and a written budget in three options.

Working timeline for a fair in Doha

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When should a stand for Doha be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Does the stand go to Doha by sea or by air?
Either. Sea freight leaves earlier and carries more volume; air freight leaves later and is our choice for lighter stands. Both options are written into the quote and the decision is taken together against the calendar.
When should we start?
Earlier than for a European fair. Because shipping takes longer, the design starts at least 8 weeks before the fair and production is brought forward. If you come to us later we first tell you what can still be done with air freight.
Who handles customs and the ATA Carnet?
We do. The parts list of the stand goes on the carnet and we follow the exit from Turkey and the entry into Qatar; if your products travel with the stand we add their list to the carnet. There is nothing for you to prepare.
Who builds the stand in Doha?
Our own crew, the same people who produce the stand in Beylikdüzü. Build-up and dismantling hours come from the organiser's and the venue's documents; we walk the stand with you the day before opening, hand it over in writing and dismantle it at the close.

Let us build your stand at your fair in Doha

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries