Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builder in Las Vegas

Taking a stand (a booth, in local terms) to Las Vegas means a longer calendar and a thicker file than a European fair. We have done this in the United States before: the 54 square metre timber stand for Er Bakır at Interwire 2025 in Atlanta. The same crew works on Las Vegas jobs; the stand is produced in our workshop in Beylikdüzü, shipped to the US and built at Venetian Expo by our own people.

What we do at Las Vegas fairs

The fair we follow in Las Vegas is SHOT Show, on 19–22 January 2027 at Venetian Expo. For a company showing firearms, hunting or defence products the design starts with the lockable display cases, the product hangers and the light falling on each item; the maxima stand we built for Ağaoğlu Silah at IWA 2025 in Nuremberg is an example of that kind of stand. The firearms and defence pages collect what we do in those sectors.

For our work in the United States see the Er Bakır stand at Interwire 2025 in Atlanta; freight, customs and build-up for Las Vegas follow the same routine. The United States page describes how we work across the country.

Freight, customs and local support

A stand travels to the US by sea or air, and we choose according to the schedule and the volume of the stand. Sea freight needs an earlier departure, so for US jobs we bring production forward well ahead of a European timetable and confirm the shipping date in writing at the quote stage. We issue the ATA Carnet for temporary import, follow the exit from Turkey and the entry into the US, and bring the dismantled stand back on the same document after the fair. At US fairs some of the work inside the hall is reserved for the organiser's appointed local contractors; at the technical file stage we set out which tasks our own crew can do and which go to the local crew under hall rules, and put it in writing for you. The full process outside Turkey is on the international stand page.

Which stand type for Las Vegas

  • Custom timber build: uninterrupted surfaces, dimensions drawn for your brand, purpose-made joinery for lockable display cases; 2–5 days of build-up in the hall.
  • Maxima system: aluminium grid with printed panels; light enough to make air freight worthwhile, built in 1–3 days.
  • Island and corner stands: on plots with several open sides we turn the product towards the aisle.

Send the fair name and dates, your floor area and the number of open sides through the quote form; within 48 hours you receive a free first concept and a written budget in three options.

Fair venues in Las Vegas

  • Venetian Expo
    Fairs in calendar
    1 fairs in calendar

    Akros Mimarlık builds turnkey exhibition stands at Venetian Expo in Las Vegas for companies exhibiting from Turkey, customs handled by us. Each stand is designed and produced in our Beylikdüzü workshop, shipped under ATA Carnet and built and dismantled by our own crew; for SHOT Show we bring our firearms experience from IWA in Nuremberg. First concept free, written budget in three options.

Upcoming fairs in Las Vegas

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

January 2027

Working timeline for a fair in Las Vegas

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

Do you build at the fair venues in Las Vegas?
Yes: Venetian Expo. Hall rules vary by fair; we submit the technical file to the organiser.
When should a stand for Las Vegas be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Can we get a quote for the upcoming fairs in Las Vegas?
Yes. The link next to each fair in the calendar opens a quote form with the fair name and dates already filled in; add the floor area and stand type and send it.
When should the stand leave for the US?
Well ahead of a European fair. With sea freight we bring production forward and write the shipping date into the schedule at the quote stage; air freight leaves later but carries less volume. The design should start at least 8 weeks before the fair, and for the US we prefer earlier.
Who handles US customs and the ATA Carnet?
We do. The parts list of the stand goes on the carnet and we follow the exit from Turkey and the entry into the US; if your products travel with the stand we add their list to the carnet. There is nothing for you to prepare.
Is the build-up done by your own crew?
The crew that produces the stand travels to Las Vegas. At US fairs some tasks inside the hall may belong to the organiser's local contractor; we settle this at the technical file stage and write the scope item by item. We walk the stand with you the day before opening and hand it over in writing.
Do you make the lockable display cases and product hangers?
Yes, in our workshop. The case locks, glass and internal lighting are produced together with the stand, and the product hangers are drawn for the weight and size of your products. At the trial assembly we lock the cases and test their lighting before anything is packed.

Let us build your stand at your fair in Las Vegas

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries