Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builder in Qatar

What we do for a company exhibiting in Doha is what we do for Dubai: the stand is produced in Istanbul, shipped by container or by air, and built in the hall by our own crew. The tiring part of exhibiting in Qatar is not the drawing of the stand; it is the shipping calendar, the temporary import document and the venue’s approval file. We write all three into the contract and follow them on your behalf.

What we do at fairs in Qatar

We draw and produce the stand in our workshop in Beylikdüzü; the trial assembly and lighting test are finished there, then the stand is packed and shipped. In Doha the build and the dismantling are our crew’s job. The technical correspondence with the organiser, the structural and electrical approval, the graphics and print are ours; Arabic or English copy comes from you and goes to print as supplied.

There is no published Qatar project on this page yet; how we work in the Gulf and in distant markets is shown by jobs in other halls. In Atlanta the 54 square metre timber stand for Er Bakır at Interwire 2025 travelled overseas and was built by our crew. On the energy side we built 110 square metres for Solinved at SolarEX 2025 in Istanbul, and on the construction side 153 square metres for GMS at bauma 2025 in Munich. For a company going to an energy or building fair in Doha, those three jobs show how we work. The regional arrangement is described on the United Arab Emirates and Dubai pages.

Freight, customs and local support

Shipment to Doha goes by sea in a container or by air; we choose whichever the calendar allows and write the shipping date into the contract. With sea freight, production is pulled forward by weeks. We issue the ATA Carnet for temporary import and follow customs at the Turkish exit and the Qatari entry; the stand returns on the same carnet after the fair. The venue’s stand design approval, the height and structural drawings and the electrical file are prepared in the organiser’s format and chased by us. During build week our crew is in the hall; the process is on the exhibition logistics page.

Which stand type

Because packed volume matters on a long shipment, the maxima system is our first suggestion: 12–200 square metres, compact in a container, 1–3 build days. For companies that want an uninterrupted brand surface or have taken more than 100 square metres we build custom timber, 2–5 build days. We draw both for the same plot and show them with the shipping difference alongside; the decision is yours.

Working timeline for a fair in Qatar

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When should a stand for Qatar be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
How do you ship the stand to Doha, and how do customs work?
By sea in a container or by air, decided by the fair date. Temporary import runs on an ATA Carnet; we issue the carnet and follow customs on both sides. If your exhibits travel in the same shipment as the stand, they go on the same carnet.
Does the stand need approval at the venue in Doha?
We prepare whatever approval file the organiser asks for: structural drawing, height, electrical. We run the approval correspondence and production does not start until the approval is in; the hall’s build days come from the technical file and the programme is planned around them.
Who builds the stand?
The Beylikdüzü crew that produced it travels to Doha and builds and dismantles it. If the venue reserves a step for local teams, we plan it according to the organiser’s manual and tell you in writing beforehand.
When should we start?
For Qatar 8 weeks is the minimum, earlier if sea freight is the choice. Send the fair name and dates, your floor area and number of open sides through the quote form; we reply within 48 hours with a first concept and the shipping options.

Let us build your stand at your fair in Qatar

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries