Exhibition stand builder in France

Taking a stand to a fair in Paris is the arrangement we run for Germany moved one lorry day further: production in the workshop, road freight, an ATA Carnet, our own crew in the hall. We have built in 10 countries and sold the same thing every time: one contact who draws, produces and builds the stand. That is what we offer in France as well; instead of a local stand contractor, a stand that has already had its lighting test and trial assembly in Beylikdüzü arrives at the Paris hall.

What we do at fairs in France

We draw the stand, produce it in our workshop, load it onto the lorry, build it in Paris and take it down when the fair closes. The technical correspondence with the organiser, the height and structural approval, the electrical order, the graphics and print are our job. French-language copy comes from you and goes to print as supplied; the hall correspondence is run in the language and format the organiser asks for.

There is no published French project on this page yet; how we work in Europe is shown by the jobs in neighbouring countries. In Karlsruhe, a 100 square metre timber stand for İBA Kimya at PaintExpo 2024; in Cologne, a 105 square metre timber stand for Cemer Kent Ekipmanları at FSB; in Hanover, a 182 square metre maxima stand for Emintosun at LIGNA 2025. All three went the same way: Beylikdüzü, lorry, carnet, hall. A stand for Paris goes the same way, and the Germany page describes that arrangement in detail.

Freight, customs and local support

Shipment to Paris goes by road on a single lorry. We issue the ATA Carnet for temporary export, follow the exit from Turkey and the entry into France, and the stand returns on the same carnet after the fair. During build week our crew is in the hall, so a missing part, an extra rigging point or a power question has someone on the spot. Our Aachen office provides support on site at German fairs; in Paris your contact is our crew from Istanbul. The process is on the exhibition logistics page and the wider picture on the international exhibition stand page.

Which stand type

The maxima system, compact on the lorry and built in 1–3 days, is our first suggestion for a long road run; 12–200 square metres. For companies that want uninterrupted surfaces, free dimensions and brand-specific detail we build custom timber, 2–5 build days. If the plot is open on two or three sides we also draw an island or corner layout and show it side by side; you decide with the shipping difference in front of you.

Working timeline for a fair in France

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When should a stand for France be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
How does the stand get to France, and what is needed at customs?
By road, with an ATA Carnet. The carnet is the temporary export document for the stand; it is stamped on the way out and on the way in, and the stand returns on the same carnet after the fair. We handle the documents and the customs follow-up; you supply the list and weight of the exhibits.
Who follows the hall regulations in Paris?
We do. The technical file covering height, rigging, fire class and the electrical order is prepared in the organiser’s format, and production does not start until the approval is in. We take the hall’s build days and hours from the technical file and plan the programme around them.
Who builds the stand?
The Beylikdüzü crew that produced the stand travels to Paris and builds and dismantles it. We do not hand work to local subcontractors; our German jobs run on the same basis.
When should we start?
For France a comfortable schedule starts 8 weeks before the fair: design approval and technical file at 6 weeks, production at 4 weeks, trial assembly and the lorry at 1 week. Send the fair name and dates, your floor area and number of open sides through the quote form; the first concept arrives free within 48 hours.

Let us build your stand at your fair in France

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote