
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Trade fair
For a parts producer travelling from Turkey to Automechanika Frankfurt the stand has two jobs: to put the product properly in front of German and international buyers, and to leave room for conversations over five days. We produce the stand in our workshop in Beylikdüzü, move it from Istanbul to Frankfurt under an ATA Carnet, build it at Messe Frankfurt with our own crew and dismantle it at the close. Our Aachen office is on site during build week.
We take your floor area and product groups and draw a three-dimensional concept; after approval we send the technical file to the hall management at Messe Frankfurt in German. Across 10 halls and 366,637 square metres, the hall your plot sits in decides the gate slot for the lorry and the build day. Graphics and print are ours.
On a parts stand the product wall is the backbone. We draw a reinforced hanging wall for heavy parts such as wheels, brake discs and exhaust systems, lit shelving for filters and small parts, and floor plinths for batteries and compressors. For workshop equipment running live we open the power request. A meeting table and a closed meeting room are non-negotiable at this fair; distributor conversations do not happen in the aisle.
At the Istanbul edition of the same fair we built the 60 square metre maxima stand for Waspo in 2024; a maxima stand of that size usually goes up in the hall in one to three days. Our other work for the sector is on the automotive page. How we work in the country is explained on the exhibition stands in Germany page. For the fair at Tüyap there is our Automechanika Istanbul page.
This year's fair runs 8–12 September 2026, a week from now, so new stand production for this edition is outside the calendar. For the next edition a comfortable programme starts 8 weeks before the fair with the brief, the three-dimensional concept and the budget; design approval and technical file at 6 weeks, workshop production and print files at 4 weeks, trial assembly and lighting test in the workshop at 1 week, then straight onto the lorry to Frankfurt. Build in the hall during fair week, a walk-through the day before opening, dismantling at the close. Put your floor area and product groups into the quote form; we reply within 48 hours and the first concept is free.
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

EvafoneTechnology
12 m²2026IstanbulPetzoo Eurasia

Er BakırMining
54 m²2025AtlantaInterwire

Yeniler EtiketPackaging
100 m²2025IstanbulEurasia Packaging Istanbul
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote