
Yeniler EtiketPackaging
Yeniler Etiket Avrasya Ambalaj 2025 Istanbul exhibition stand
100 m²2025IstanbulEurasia Packaging Istanbul
Trade fair

Exhibit at the packaging fair at Tüyap with us and you deal with one company from the first sketch to the last screw coming out on closing night. Our workshop and Tüyap are both in Beylikdüzü, so in build week a missing part travels from the workshop to the hall within the day. We built stands here for Grossan and Yeniler Etiket over the last two editions; both are below.
We draw the stand, produce it in our workshop in Beylikdüzü, build it at Tüyap with our own crew and dismantle it after the fair closes. The technical file for the Tüyap hall management, the electricity and rigging applications, graphics and print are handled by us.
Two things carry a packaging stand: the product wall and the machine. We draw the product wall with recesses sized to your rolls, boxes or bottles so that every item sits in its own light. If you are bringing a running machine, we take its weight and power requirement at the start, reinforce the floor platform accordingly and apply to the hall for the correct electrical supply. A closed back room behind the meeting table keeps samples and catalogues out of view.
In 2024 we built a 25 square metre maxima stand for Grossan. In 2025 we built a 100 square metre custom timber stand for Yeniler Etiket ; the project page has ten photographs. Custom timber is what we suggest when free dimensions and seamless surfaces matter. Other stands for the sector are listed on our packaging page, and in December we are back in the same halls for Plast Eurasia.
The fair runs 13–16 October 2026. A comfortable schedule starts 8 weeks out with the brief, the 3D visual and the budget: design approval and technical file at 6 weeks, workshop production and print files at 4 weeks, trial assembly and lighting test in the workshop at 1 week, then the build at Tüyap in fair week. If you are behind that schedule, we tell you what can still be done and run an accelerated programme; maxima is often the answer then. Send the fair name, floor area and number of open sides through the quote form; we reply within 48 hours, first concept free.
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote