
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Trade fair
The engineer who walks onto your stand at Middle East Energy wants to see inside the product: the switchgear door open, the cable section on the wall, the transformer on the floor. We draw the stand around the weight and the power demand of those products. Dubai World Trade Centre has 17 halls and 105,000 square metres; the energy fair spreads over several of them, so the first drawing shows how your stand reads from the aisle.
We draw the stand in Beylikdüzü and send a three-dimensional visual for approval. Production is in our own workshop: a reinforced floor for cable drums and transformers, a wall that can be wired from behind for switchgear, an angled mount for solar modules are made there and go through a trial assembly. Then dispatch: freight, temporary import documents and Dubai customs are ours. We handle the technical file, the power rating and the floor load declaration with the hall management. Our own crew builds the stand and dismantles it on closing night.
If your product will be shown live, with the panel energised, we enter the power and protection details the hall management asks for into the technical file and route the cables under the floor. The meeting room goes on the side away from the noise. Our Dubai page explains how we operate in the city; the energy page lists our work in the sector.
An energy company heading to Dubai usually looks at our Istanbul work first: the 110 square metre timber stand we built for Solinved at SolarEX 2025. On the charging side, the Hongfa EV Charge 2025 Istanbul exhibition stand and the Eonus EV Charge 2025 Istanbul exhibition stand are maxima stands of 25–28 square metres. For Dubai we draw the stand afresh for that hall and add freight and customs.
In a comfortable programme the brief, first concept and budget come 8 weeks before the fair; design approval and technical file at 6 weeks; workshop production and print at 4 weeks; trial assembly and dispatch at 1 week. Build in the hall during fair week, handover walk the day before opening, dismantling at the close. Heavy product going to Dubai by sea is dispatched earlier still. As soon as the date of the next edition is fixed, write the fair name and your floor area into the quote form; we reply within 48 hours.
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

EvafoneTechnology
12 m²2026IstanbulPetzoo Eurasia

Er BakırMining
54 m²2025AtlantaInterwire

Yeniler EtiketPackaging
100 m²2025IstanbulEurasia Packaging Istanbul
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote