Skip to content
Akros Mimarlık
TR

Trade fair

Kalite Quality Fair exhibition stands

General view of the Pcs Test stand at the fair 2025 in Istanbul: a 36 sqm custom timber build.

The quality manager who walks onto your stand at the Kalite Quality Fair wants to see the instrument running, place the sample themselves and read the measurement on the screen. We build the stand for that: a solid, vibration-free demonstration counter, power next to the instrument, light that keeps the screen readable and a table at the back where an offer can be discussed. We know this sector; in 2025 we built the 36 square metre timber stand for Pcs Test.

What we do for you at the Kalite Quality Fair

We draw the stand in Beylikdüzü and send a three-dimensional visual for approval. Production is in our own workshop: the demonstration counter, the instrument niche and the closed meeting room are made there and go through a trial assembly. Then the lorry goes to Ankara; as a domestic job there is no customs, freight is ours and your instruments can travel on the same lorry as the stand. We handle the technical file and the power order with ATO Congresium and follow the venue rules as written. Our own crew builds the stand and dismantles it on the evening of 7 November.

Test equipment is sensitive, so the counter is built on its own structure, separate from the stand walls; when a visitor leans on the wall the instrument does not move. We ask for the weight and power rating of the instrument in the first conversation. Our Ankara page explains how we operate in the city; the test equipment page lists our work in the sector.

Stands we have built in this sector

The 36 square metre timber stand we built for Pcs Test in 2025: produced in Beylikdüzü and built by our own crew; on stands of this kind the instrument counter faces the aisle, with the closed meeting room and lockable cupboard at the back. On the measurement and automation side, the Trex 2024 Istanbul exhibition stand, a 42 square metre maxima at CNR Expo. Companies from the same sector also work with us at WIN EURASIA in Istanbul.

Which stand type for the Kalite Quality Fair

  • Custom timber build: the Pcs Test stand was this type; instrument counter on its own structure, seamless surfaces, closed room; 20–500 square metres, 2–5 build days.
  • Maxima system: 12–200 square metres, built in 1–3 days; a quick solution for companies exhibiting with a few instruments and screens.
  • Portable stand: 4–20 square metres, built in one day; for companies exhibiting with a single instrument.

Schedule

The fair runs 4–7 November 2026. A comfortable programme: brief, first concept and budget on 9 September; design approval and technical file on 23 September; workshop production and print on 7 October; trial assembly, lighting test and dispatch on 28 October. Build in the hall during fair week, handover walk on 3 November, dismantling on the evening of 7 November. If the date is close we first tell you what an accelerated programme can still deliver; as a domestic job an accelerated programme with a maxima stand is easier to set up. The quote form is here and we reply within 48 hours.

Kalite Quality Fair 2026: 4–7 November 2026, ATO Congresium, Ankara. 8 weeks to go. Official fair site

Preparation timeline

  1. 9 September 20268 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 23 September 20266 weeks before

    Design approval, technical file submitted to the organiser

  3. 7 October 20264 weeks before

    Production in the workshop; graphics and print files

  4. 28 October 20261 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 4 November 2026Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 1

All projects

Frequently asked

When and where is Kalite Quality Fair 2026?
Kalite Quality Fair 2026 takes place 4–7 November 2026 at ATO Congresium (Ankara). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for Kalite Quality Fair 2026 be ordered?
Starting by 9 September 2026 for a custom timber stand, or around 7 October 2026 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
Have you built at Kalite Quality Fair before?
Yes; 1 of our stands are listed on this page. Each project states the year, floor area and stand type; we know the hall rules and build hours from that work.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Our instrument will run on the stand. How are the counter and power handled?
We ask for the weight, dimensions and power rating of the instrument. The counter is built on a structure independent of the stand walls, the power point goes next to the instrument, and we order the supply from the venue.
Do you take our instruments to Ankara?
We can. The instruments travel on the same lorry as the stand in your own packaging; in the hall we build the stand first and then place the instruments. After the fair they return to Istanbul on the same lorry.
Can the stand have a closed meeting room and a lockable cupboard?
Yes. On stands of this kind we draw a room with a table and a lockable cupboard at the back; offers and spare samples stay there. Door and walls are produced in the workshop.
How many build days, and whose crew?
Our own crew builds: maxima in 1–3 days, timber in 2–5 days. We follow ATO Congresium's build hours and do the handover walk with you the day before opening.

Let us build your stand at Kalite Quality Fair 2026

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs