
Pcs TestTest Equipment
Pcs Test 2025 Ankara exhibition stand
36 m²2025AnkaraKalite Quality Fair
Trade fair

The quality manager who walks onto your stand at the Kalite Quality Fair wants to see the instrument running, place the sample themselves and read the measurement on the screen. We build the stand for that: a solid, vibration-free demonstration counter, power next to the instrument, light that keeps the screen readable and a table at the back where an offer can be discussed. We know this sector; in 2025 we built the 36 square metre timber stand for Pcs Test.
We draw the stand in Beylikdüzü and send a three-dimensional visual for approval. Production is in our own workshop: the demonstration counter, the instrument niche and the closed meeting room are made there and go through a trial assembly. Then the lorry goes to Ankara; as a domestic job there is no customs, freight is ours and your instruments can travel on the same lorry as the stand. We handle the technical file and the power order with ATO Congresium and follow the venue rules as written. Our own crew builds the stand and dismantles it on the evening of 7 November.
Test equipment is sensitive, so the counter is built on its own structure, separate from the stand walls; when a visitor leans on the wall the instrument does not move. We ask for the weight and power rating of the instrument in the first conversation. Our Ankara page explains how we operate in the city; the test equipment page lists our work in the sector.
The 36 square metre timber stand we built for Pcs Test in 2025: produced in Beylikdüzü and built by our own crew; on stands of this kind the instrument counter faces the aisle, with the closed meeting room and lockable cupboard at the back. On the measurement and automation side, the Trex 2024 Istanbul exhibition stand, a 42 square metre maxima at CNR Expo. Companies from the same sector also work with us at WIN EURASIA in Istanbul.
The fair runs 4–7 November 2026. A comfortable programme: brief, first concept and budget on 9 September; design approval and technical file on 23 September; workshop production and print on 7 October; trial assembly, lighting test and dispatch on 28 October. Build in the hall during fair week, handover walk on 3 November, dismantling on the evening of 7 November. If the date is close we first tell you what an accelerated programme can still deliver; as a domestic job an accelerated programme with a maxima stand is easier to set up. The quote form is here and we reply within 48 hours.
Kalite Quality Fair 2026: 4–7 November 2026, ATO Congresium, Ankara. 8 weeks to go. Official fair site
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote