Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builder in London

Turkish companies heading for a London fair usually open the conversation with UK customs, expecting the process to be different now that the country is outside the European Union. On our side it is not: the exit from Turkey already runs on an ATA Carnet, and the entry into the UK uses the same carnet. The stand is produced in our workshop in Beylikdüzü, trucked over and built in the hall by our own crew.

What we do at London fairs

Whichever venue in London you are booked into, the order of work is the same: brief, three-dimensional concept, written budget, design approval, the organiser's technical file, workshop production, trial assembly, freight, build-up, handover and dismantling. UK organisers ask for their own paperwork on stand structure, the fire class of materials and the electrical installation; we prepare and send it right after design sign-off and do not start production before the approval is in. Graphics and print come from our workshop, and the furniture and lighting travel with the stand.

We do not yet have a published project page from London. For our work in Europe see the İba Kimya stand at PaintExpo 2024 in Karlsruhe and the Ağaoğlu Silah stand at IWA 2025 in Nuremberg; production, freight and build-up for London follow the same routine. The United Kingdom page covers the country as a whole.

Freight, customs and local support

The stand travels by truck in labelled crates; the exit from Turkey and the entry into the UK run on an ATA Carnet that we issue and follow on both sides. After the fair the dismantled stand returns to Turkey on the same carnet. Because the road to London is longer than to a fair inside the EU, we place the shipping date earlier in the schedule and confirm it in writing at the quote stage. If you want your products on the same truck we add their list to the carnet. Everything we do outside Turkey is on the international stand page, and the freight steps are on the exhibition logistics page.

Which stand type for London

  • Custom timber build: uninterrupted surfaces, dimensions drawn for your brand, workshop production; 2–5 days of build-up in the hall.
  • Maxima system: printed panels on an aluminium grid, built in 1–3 days; our first suggestion for London fairs that allow few build-up days.
  • Modular stand: for small plots and jobs that need to come off the truck and go up quickly.

Send the fair name and dates, your floor area and the number of open sides through the quote form; within 48 hours you receive a free first concept and a written budget in three options.

Working timeline for a fair in London

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When should a stand for London be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Is UK customs different from the EU?
Not in our process. The exit from Turkey already runs on an ATA Carnet and the entry into the UK uses the same document. We issue the carnet and follow the procedure on both sides; there is nothing for you to prepare.
When should the stand leave for London?
Earlier than for a fair inside the EU: the road is longer and there is customs at both ends. The shipping date is written into the schedule at the quote stage and production is planned back from it. For a comfortable schedule the design starts 8 weeks before the fair.
Who prepares the structural and electrical paperwork the organiser asks for?
We do. The stand plan, height approval, fire-class declaration for materials and the electrical installation details go to the organiser right after design sign-off. Production does not start until the approval is in, so nothing surprises you in the hall.
Who builds and dismantles the stand?
The crew that produces the stand in Beylikdüzü travels to London. Build-up and dismantling hours come from the organiser's and the venue's documents; we walk the stand with you the day before opening and hand it over in writing.

Let us build your stand at your fair in London

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries