Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builder in United Arab Emirates

When a company exhibiting in Dubai or Abu Dhabi comes to us, we produce the stand in Istanbul and build it on site. For most products travelling from Turkey to the Gulf that is the same arrangement as a European fair, except that a container or an aircraft replaces the lorry. Our own crew builds and dismantles, we run the approval file with the hall management, and you are not left alone with a subcontractor in a hot and distant hall.

What we do at fairs in the United Arab Emirates

At Dubai World Trade Centre we are quoting for three fairs: Gulfood Manufacturing on 3–5 November 2026, Big 5 Global on 23–26 November 2026, and Middle East Energy on the energy side. In Abu Dhabi, VIV MEA at ADNEC runs on 23–25 November 2027. The stands we have built in these sectors stand in other halls: for construction, the 153 square metre maxima stand for GMS at bauma 2025 in Munich; for energy, the 110 square metre timber stand for Solinved at SolarEX 2025 in Istanbul; for livestock, the 40 square metre stand for Atlas Yem at AGROS Expo 2024 in Moscow. A building materials producer heading to Big 5 can look at the GMS stand, a feed company heading to VIV MEA at the Atlas Yem stand, to see how we work.

Design and production happen in Beylikdüzü; the trial assembly and lighting test are finished in the workshop, then the stand is packed and shipped. In the Dubai and Abu Dhabi halls the build and the dismantling are our crew’s job.

Freight, customs and local support

Shipments to the Gulf go by sea in a container or by air; we choose whichever the calendar allows and write the shipping date into the contract. We issue the ATA Carnet for temporary import and follow customs at the Turkish exit and the Emirates entry; the stand returns on the same carnet after the fair. We submit the stand design to the organiser for approval before the build; the height, structural and electrical file is prepared in the organiser’s format and the approval is chased by us. The process is set out on the exhibition logistics page, and the Dubai and Abu Dhabi pages carry city-level detail.

Which stand type

Because packed volume matters on a long shipment, the maxima system is our first suggestion: 12–200 square metres, compact in a container, 1–3 build days in the hall. For companies that want an uninterrupted brand surface or have taken more than 100 square metres we build custom timber, 2–5 build days. If the plot is open on two or three sides we draw an island or corner layout for it as well and show it alongside.

Upcoming fairs in United Arab Emirates

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

November 2026

November 2027

Working timeline for a fair in United Arab Emirates

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When should a stand for United Arab Emirates be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Can we get a quote for the upcoming fairs in United Arab Emirates?
Yes. The link next to each fair in the calendar opens a quote form with the fair name and dates already filled in; add the floor area and stand type and send it.
How do you ship the stand to Dubai, and how do customs work?
By sea in a container or by air, decided by the fair date. Temporary import runs on an ATA Carnet; we issue the carnet and follow customs on both sides. If your exhibits travel in the same shipment as the stand, they go on the same carnet.
Does the stand need approval at the venue in Dubai?
We prepare whatever approval file the organiser asks for: structural drawing, height, electrical. We run the approval correspondence and production does not start until the approval is in; the hall’s build days come from the technical file and the programme is planned around them.
Who builds the stand?
The Beylikdüzü crew that produced it travels to Dubai or Abu Dhabi and builds and dismantles it. If the venue reserves a step for local teams, we plan it according to the organiser’s manual and tell you in writing beforehand.
When should we start?
For Gulf fairs 8 weeks is the minimum, earlier if sea freight is the choice. Send the fair name and dates, your floor area and number of open sides through the quote form; we reply within 48 hours with a first concept and the shipping options.

Let us build your stand at your fair in United Arab Emirates

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries