
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Industry
A dealer on a hardware stand wants to pick the tool up, feel its weight and hear the drill run. We build the stand for that: a perforated or slotted product wall that hangs the tools in series, a solid demo bench in front where the machine is switched on, and a seated meeting area at the side where the dealer agreement is discussed. Hundreds of products should all be visible without the stand looking like a warehouse rack; that balance is our job.
We draw the stand, produce it in our own workshop in Beylikdüzü, build it with our own crew and take it down afterwards. Graphics and print are ours. The technical file for the hall and, for fairs abroad, the freight, ATA Carnet and customs are ours as well; your power and compressed air needs go into that technical file.
Hardware is heavy and sharp. The product wall is drawn from the load: we ask at the start how many kilograms of tools will hang on each metre of wall and reinforce the structure with steel accordingly. The demo bench gets a wear-resistant top with the power and cable duct recessed underneath. A drawer cabinet for screws and anchors, retail shelving for packaged product and a floor plinth for larger machines all find their place in the same plan. The colour of your packaging matters as much as the packaging itself, so we carry it across the stand surface in one piece.
In Turkey the hardware and hand tool fairs take place in Istanbul, in the halls of Tüyap and CNR Expo; our Istanbul page explains how we build at both. For fairs in Germany our Aachen office supports on site. Stands we have built for companies showing metal product: Mazlum Boru 2024 Istanbul is a 36 square metre maxima stand at wire Eurasia, Öz Metal 2023 Hanover 36 square metres at HANNOVER MESSE, and Tekno Vals 2022 Hanover 35 square metres at the same fair. Metal product companies also have our metal processing page.
Send the fair name and dates, your floor area and the number of open sides; we reply within 48 hours. The first concept is free, with a 3D visual; the written budget has three options, scope listed item by item. For a timber build, starting 8 weeks before the fair is comfortable: design approval at 6 weeks, workshop production at 4, trial assembly and lighting test at 1. The quote form opens here.
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

EvafoneTechnology
12 m²2026IstanbulPetzoo Eurasia

Er BakırMining
54 m²2025AtlantaInterwire

Yeniler EtiketPackaging
100 m²2025IstanbulEurasia Packaging Istanbul
Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.
Request a quote