Skip to content
Akros Mimarlık
TR

Industry

Agriculture trade fair stands

On an agriculture stand the product is either in the soil or on the machine. Soil-filled display beds for seed, fertiliser and seedlings; a floor that carries the load of a tractor, a plough or an irrigation rig; a real section of greenhouse built inside the stand for greenhouse systems. We draw the stand to whichever of these is yours, so a farmer or a dealer sees the product by handling it.

What we do for you at agriculture fairs

We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and dismantle it when the fair closes. The delivery slot and forklift requirement for your equipment are agreed with the hall management by us; the floor loading notice and the water application go into our technical file. Graphics and print are ours; for fairs abroad so are the stand freight, the ATA Carnet and customs. Your machine arrives with your own forwarder; placement is in the build-up programme.

The scale is large on an agriculture stand, so we keep the walls low and the product high; the tractor should be visible from the aisle. Seed and fertiliser companies bring soil and water, so a sealed base and a water connection are on the plan from the start. If an irrigation system is to run, we draw a closed tank that circulates the water and nothing spills onto the hall floor.

Which agriculture fairs we work at

On the livestock side, EuroTier at Deutsche Messe Hannover runs on 10–13 November 2026, AGROS Expo in Moscow on 20–22 January 2027 and VIV MEA in Abu Dhabi on 23–25 November 2027; see our livestock page for those. We know the Hanover halls, where we built the 182 square metre maxima stand for Emintosun at LIGNA 2025, and in Germany our Aachen office gives local support. For agriculture fairs in Turkey we have pages for Konya and Izmir.

Which stand type for an agriculture stand

  • Island and corner stands: 36–800 square metres, built in 3–6 days. The machine in the middle with all four sides walkable; our first suggestion for agricultural machinery.
  • Custom timber build: 20–500 square metres, built in 2–5 days. Soil bed, sealed base and a closed meeting room from a single hand.
  • Maxima system: 12–200 square metres, built in 1–3 days. An aluminium grid that goes up quickly around the machine once it is in the hall.

How we work

Fair name, dates, floor area and number of open sides; within 48 hours you get a free first concept in three dimensions and a written budget in three options, scope itemised. Start 8 weeks before the fair: design approval and technical file at 6 weeks, workshop production at 4, trial assembly and lighting test at 1. Put the machine’s weight and dimensions and your soil and water needs in the brief; floor and connections are drawn to them. The quote form is here.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

Can you take a tractor or large equipment onto the stand?
Yes. Give us the weight and dimensions in the brief and we calculate the floor loading, reinforce the footprint and agree the forklift route and delivery slot with the hall management. The stand floor is finished before the machine arrives.
Can we use soil and water on the stand?
You can. We produce soil beds with a sealed base for seed and seedlings, and we apply to the hall management for the water connection together with the technical file. In a hall without a water supply we build a circuit that runs on a closed tank.
Who handles freight and customs for Moscow and Abu Dhabi?
We do. The stand goes through a trial assembly in the workshop and is then shipped; we open the ATA Carnet and clear customs, and our crew is in the hall for build-up week. Your machine travels separately on its own export papers.
When should we start?
For a custom timber build, 8 weeks before the fair; for a maxima system, 4 weeks. Fairs abroad add transit time, so start early; if a job comes in late we first tell you what can still be done.

Let us build your stand at your next agriculture fair

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other industries