Skip to content
Akros Mimarlık
TR

Industry

Woodworking Machinery trade fair stands

General view of the Emintosun stand at Ligna 2025 in Hanover: a 182 sqm maxima system build.

On a woodworking machinery stand the machine runs, chips fly and there is noise. We draw the stand for that: the machine footprint, service clearance and chip extraction connection go onto the plan first, and the walls and meeting area fit into what is left. Power and compressed air are written into the technical file from the start. Visitors want to check the cut quality with their hands, so the outfeed side of the machine faces the aisle with a sample wall for finished pieces beside it.

What we do for you at woodworking fairs

We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and take it down when the fair closes. The machine’s entry, its weight and the power and air needs go into the technical file; the correspondence with the hall management is ours. Your machine is set in place on the first build day, the stand closes around it from day two and your technicians start it on the last day. For Hanover the freight, ATA Carnet and customs are our job, and our Aachen office gives local support on the German side.

A brand wall disappears easily next to a large machine. We balance the wall height against the machine, put the logo high enough to be read from the aisle and pull the meeting table into the corner furthest from the noise.

Which woodworking fairs we work at

The main fair of the sector is LIGNA in Germany, next on 10–14 May 2027 at Deutsche Messe Hanover. In 2025 we built the 182 square metre maxima stand for Emintosun there; the photograph is on its project page. In Turkey, WoodTech Istanbul runs 22–25 October 2026 at Tüyap, under the same roof as Intermob. We work outside fairs too: in 2025 we built an 8 square metre event stand for Forma Makina at Çırağan Palace; launch and event work is on the showroom and events page.

Which stand type for a woodworking stand

  • Maxima system: 12–200 square metres, 1–3 days to build in the hall. The Emintosun stand was this system; the aluminium grid closes quickly around the machine and the build day is left to the machine.
  • Island and corner stands: 36–800 square metres, 3–6 days. The machine in the centre, the working area watched from the aisle.
  • Double-decker stand: 60–600 square metres, 4–8 days. Machine below, a meeting room above and away from the noise; our suggestion on large plots at fairs like LIGNA.

How we work

Send the fair name and dates, your floor area, the number of open sides and the dimensions and weights of the machines you will bring; we reply within 48 hours. The first concept is free and three-dimensional; the written budget frame has three options with the scope listed item by item. For Hanover we start 8 weeks before the fair: design approval and technical file at 6 weeks, workshop production at 4 weeks, trial assembly and dispatch at 1 week. The quote form opens here.

Upcoming woodworking machinery trade fairs

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

October 2026

May 2027

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 2

All projects

Frequently asked

Can we run the machine on the stand and produce chips?
It depends on the hall rules. We ask the hall management about chip extraction and dust conditions through the technical file and, where needed, put the connection point on the plan. Where the hall allows it, the machine runs on the stand.
Does the machine go in first, or the stand?
The machine. The first build day is reserved for bringing it in and positioning it, and the stand closes around it from day two. If the machine is late we leave the walls open and close them on the last day.
Who arranges power and compressed air?
We do. The machine's power and air ratings go into the technical file and we request the connections from the hall management; we follow the circuit until it reaches the stand, and your team makes the final connection.
Do you take the machine to Hanover as well?
We take the stand; machine freight is planned in the same programme and the ATA Carnet and customs run together with the stand. Details are on the international exhibition stand page.

Let us build your stand at your next woodworking machinery fair

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other industries