
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Trade fair

The distributor or hospital buyer who walks onto your stand at MEDICA wants to see the device working, hold the consumable and then talk prices in a closed room. We build the stand for that: wipeable white surfaces, a powered demonstration counter for the device, a product wall and a room at the back where you can shut the door and sit down. We travel from Beylikdüzü to Messe Düsseldorf; our Aachen office is close to Düsseldorf and on site during fair week.
We draw the stand in Beylikdüzü and send a three-dimensional visual for approval. Production is in our own workshop: display cases, the device counter and the closed room are made there and go through a trial assembly. Then the lorry: freight, the ATA Carnet and customs are ours, and your devices and samples can travel on the same lorry as the stand. We handle the technical file and the power order with Messe Düsseldorf and follow the hall rules as written. Our own crew builds the stand and dismantles it on the evening of 19 November.
If several companies exhibit together at MEDICA we draw a shared pavilion: each company with its own frontage, a shared meeting area and kitchen in the middle. Our medical page lists our work in the sector; the Dusseldorf page explains how we operate in the city.
We know Messe Düsseldorf. The Saes 2024 Düsseldorf exhibition stand, a 25 square metre maxima at wire & Tube; the Alfa Metal ALUMINIUM 2025 Düsseldorf exhibition stand, a 96 square metre maxima; the Eksen Al ALUMINIUM 2025 Düsseldorf exhibition stand, 42 square metres. All three were produced in Beylikdüzü, went to Düsseldorf by lorry and were built by our own crew. For stands built around device demonstration, the Trex 2024 Istanbul exhibition stand is a 42 square metre maxima at CNR Expo.
The fair runs 16–19 November 2026. A comfortable programme: brief, first concept and budget on 21 September; design approval and technical file on 5 October; workshop production and print on 19 October; trial assembly, lighting test and dispatch on 9 November. Build in the hall during fair week, handover walk on 15 November, dismantling on the evening of 19 November. If you write now the comfortable schedule still holds; for later starts we set up an accelerated programme with a maxima build. The quote form is here and we reply within 48 hours.
Messe Düsseldorf’s technical manual asks for the stand approval drawing, the electrical load declaration and fire certificates weeks before the fair. The height limit varies by hall; anything above the standard limit and any second deck needs separate approval. Sides facing a neighbour are closed with white backs.
Rigging only through the organiser’s contracted supplier with a structural calculation; the power line likewise from the contracted supplier. B1 flame-retardant certificates are mandatory for carpet, fabric and timber; uncertified material is not admitted. No screws into the floor; carpet is fixed with double-sided tape.
At MEDICA the halls are split by product group; which hall your plot is in sets the visitor profile. The same manual structure applies at Düsseldorf’s other fairs (wire & Tube, ALUMINIUM, interpack); the process is on our exhibition stand services page.
The MEDICA visitor is a physician, a hospital purchasing manager or a distributor; they know the product and come with a specific question. Three things come forward on the stand: a locked, well-lit showcase (for small, valuable devices), hygienic, easy-to-clean surfaces (white laminate, glass, metal) and a closed meeting area shielded from noise; distributor talks are not held in the aisle.
Large devices are shown running in a trial area; electrical load and floor weight go into the declaration. On the graphic surface, certification and the product family must read at a glance; technical detail stays in the catalogue.
As construction type, a system stand (maxima) suits MEDICA’s short build window; for brand differentiation the facade is completed with timber cladding. Which type fits is compared on the stand types page.
Counting back from the 16 November opening: the design freezes by 21 September, production starts in early October, the stand is assembled and checked in the workshop and shipped at the end of October, received in Aachen in the first week of November and enters Düsseldorf in the build window. Customs via ATA Carnet, freight by truck in three to four days.
Our Aachen office is an hour from Düsseldorf: ramp slots, correspondence with the organiser in German, local supply for a missing item and on-site support throughout the build run from there. Dismantling starts on the evening of 19 November and ends the same night.
Exhibitors from Türkiye can recover part of their MEDICA expense through state support for fairs abroad; we issue the quote and invoice with the breakdown the support requires. You can explore our Düsseldorf projects and the venue page starting from our about page.
MEDICA 2026: 16–19 November 2026, Messe Düsseldorf, Dusseldorf. 3 weeks to go. Official fair site
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

EvafoneTechnology
12 m²2026IstanbulPetzoo Eurasia

Er BakırMining
54 m²2025AtlantaInterwire

Yeniler EtiketPackaging
100 m²2025IstanbulEurasia Packaging Istanbul
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote