Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builder in Gaziantep

Gaziantep is one of the longest domestic roads from our workshop, so on Gaziantep jobs the stand is always assembled once before it leaves and every part is numbered. Nothing meets for the first time in the hall. We produce the stand in Beylikdüzü, bring it to Gaziantep by truck, build it with our own crew and dismantle it when the fair closes. We work with food, carpet and textile, and machinery companies.

What we do at Gaziantep fairs

The fair name, dates, floor area and number of open sides come in; within 48 hours we send the first concept as a three-dimensional visual. After approval we submit the technical file to the organiser, produce in the workshop and handle graphics and print. The hall's height limit, rigging rule and build hours arrive with the organiser's file; we read the file, draw the stand to match and obtain the approval.

For food companies a tasting counter, sockets for refrigeration and a water connection go into the plan from the start. In carpet and textile the product itself becomes the wall; the structure that carries the carpet and the position of the product laid on the floor are drawn in the first step of the design. For machinery companies the floor load and the machine's entry sequence into the hall are planned. The industry pages show what we have built and where, with photographs: food and beverage, textile, machinery and industry. To date we have delivered close to 400 projects, all on the projects page. Companies from Gaziantep exhibiting in Istanbul will find our Tüyap and CNR Expo work on the Istanbul page.

Exhibitors from outside Turkey get the same service in Gaziantep: one contract, one contact in English, our crew in the hall for the build and the dismantling.

Freight from Istanbul and the build schedule

A comfortable programme starts 8 weeks before the fair: design approval and technical file at 6 weeks, workshop production and print files at 4 weeks, trial assembly and shipping at 1 week. For Gaziantep the freight day is added to the schedule separately, and the build crew travels with the truck. Your products can go on the same truck as the stand; the details are on the exhibition logistics page. We walk the stand together the day before opening and hand it over with a written guarantee; the dismantling at the close is ours.

Which stand type for Gaziantep

  • Maxima system: 12–200 square metres, 1–3 days to build in the hall. Small freight volume over a long road; our first suggestion for Gaziantep.
  • Custom timber build: 20–500 square metres, 2–5 days to build. For carpet fixings, a tasting counter and an uninterrupted surface; the freight volume grows, so we keep to the 8-week schedule.
  • Modular stand: 9–150 square metres, 1–2 days to build; for small plots and short fairs.

Working timeline for a fair in Gaziantep

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly and lighting test in the workshop, dispatch

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Dispatch from the workshop to the hall
What goes into exhibition stand pricing

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When should a stand for Gaziantep be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
When should we start for Gaziantep?
8 weeks before the fair, with the freight day inside the programme. If a job comes in later we first tell you what can still be done, then run an accelerated programme. Put the fair name and your floor area into the quote form; the first concept is free.
Does your crew come to Gaziantep?
Yes. Building and dismantling are done by our own crew from Istanbul. During the fair you reach us by phone; at the close we dismantle the stand and take it back.
Do you arrange water and power for tasting or refrigeration?
Yes. Give us the number of sockets and the refrigeration and water needs in the quote request; we file the electrical and water applications with the hall management and draw the counter to match.
What happens if a part is damaged on the road?
Every part is numbered and we keep the graphic files ready for reprint. The build crew brings repair materials with it, and since handover comes with a written guarantee, the problem is ours to solve; you find the stand ready at opening.

Let us build your stand at your fair in Gaziantep

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries