Skip to content
Akros Mimarlık
TR

Industry

Food and Beverage trade fair stands

The food packaging exhibition stand we built for Grossan: a corner stand with two open sides, red and white brand fascias, product shelving and a reception counter.

A food stand lives or dies at the tasting counter. That is where we start: a wipe-clean worktop, a place and a power line for the chiller, a sink connection, and cool lighting that does not warm the samples. Anuga runs for five days, so the counter is drawn to be wiped down morning and evening for five days, not to look good on the first one.

What we do for you at food and drink fairs

We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and dismantle it when the fair closes. The water and power application goes to the hall management from us, with the line under the counter, the chiller socket and the sink drain already marked on the technical drawing. Graphics and print are ours; for fairs abroad so are the stand freight, the ATA Carnet and customs. Your product arrives separately on its own food paperwork, and the stand is ready before it does.

The part nobody sees saves a food stand. Behind the counter we keep a closed service area for the bin, the fridge and the washing-up, so the visitor side stays clean. For drinks brands we backlight the bottle wall; the packaging colour does as much work as the liquid. For deli and dairy the chiller faces the staff side, so an open door does not blow cold air into the aisle.

Which food fairs we work at

Koelnmesse in Cologne hosts two of them: Anuga for finished products on 9–13 October 2027 and Anuga FoodTec for food machinery and processing on 23–26 February 2027. We know Cologne; in 2023 we built the 28 square metre timber stand for Doqu Home at imm cologne, and at German fairs our Aachen office gives local support. In Dubai, Gulfood Manufacturing runs at Dubai World Trade Centre on 3–5 November 2026; we ship the stand there and clear it ourselves.

Which stand type for a food stand

  • Custom timber build: 20–500 square metres, built in 2–5 days. The easiest route to a built-in chiller, a bar that is one piece with the counter and a closed service area.
  • Maxima system: 12–200 square metres, built in 1–3 days. Printed panels carry the packaging artwork at large scale; the counter is produced separately and fixed to the grid.
  • Modular stand: 9–150 square metres, built in 1–2 days. For joint participations or a small plot.

How we work

Fair name, dates, floor area and number of open sides; within 48 hours you get a free first concept in three dimensions and a written budget in three options, scope itemised. Starting 8 weeks before the fair gives design approval and the technical file at 6 weeks, workshop production at 4, trial assembly and lighting test at 1. For a fair with a water connection such as Anuga the hall’s application deadline goes into the schedule too. The quote form is here.

Upcoming food and beverage trade fairs

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

November 2026

February 2027

October 2027

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

Who arranges water and power on the stand?
We do. The application goes to the hall management together with the technical file, with the water, drain and power points under the counter marked on the plan. Give us the power rating of the chiller or oven in the brief and we apply for the right supply.
Is the tasting counter suitable for food hygiene?
The worktop is a wipe-clean material without joints, and the visitor side is separated from the service side. The sink and the bin stay closed off on the service side. The organiser’s rules on serving food are tracked in our technical file.
How does the stand get to Dubai?
It goes through a trial assembly in our workshop, then travels to Dubai World Trade Centre; we handle customs and our crew is in the hall for build-up week. Your food samples travel separately on their own import papers.
When should we start?
For a custom timber build, 8 weeks before the fair; for a maxima system, 4 weeks. Cologne and Dubai add transit time, so stay on the early side. If a job comes in later we first tell you what can still be done.

Let us build your stand at your next food and beverage fair

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other industries