
TandemSignalling
Tandem 2022 Istanbul exhibition stand
96 m²2022IstanbulIntertraffic Istanbul
Trade fair

The product of a company coming to Intertraffic Istanbul is something that normally stands in the street: a signal pole, a lamp group, a barrier, a camera, a variable message sign. Getting those onto a stand at full size and in working order is more work than drawing the stand itself. We plan the structure, the anchoring and the power for it, produce the stand in our workshop in Beylikdüzü and build it in the hall with our own crew.
We take your floor area and product list and draw a three-dimensional concept; after approval we send the technical file to the hall management and open the power request. Walls, plinths and the meeting area are produced in the workshop and go through a trial assembly. Graphics and print are ours; the specification tables that public sector buyers read are printed large enough to be read standing.
A free-standing signal pole has to be fixed to the floor of the stand. Because the hall floor cannot be drilled, we draw either a weighted base or an anchor into the stand's own raised floor. The power line for flashing lamp groups is tested before opening. Municipal and agency delegations visit this fair, so the closed meeting room matters in the plan; the presentation screen and seating go on the side not visible from the aisle.
In 2022 we built the 96 square metre custom timber stand for Tandem at CNR Expo Istanbul; at this fair we favour a custom timber build for heavy product anchoring and uninterrupted surfaces. Our other work in the field is on the signalling page; everything we have built in the city is on the Istanbul page.
The fair is held every two years; once the dates are announced they appear in our trade fair calendar. A comfortable programme starts 8 weeks before the fair with the brief, concept and budget; design approval and technical file at 6 weeks, workshop production and print files at 4 weeks, trial assembly and lighting test in the workshop at 1 week. Build in the hall during fair week, a walk-through the day before opening, dismantling at the close. Put your floor area, the number of open sides and the list of heavy products into the quote form; we reply within 48 hours and the first concept is free.
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote