Skip to content
Akros Mimarlık
TR

Trade fair

Plast Eurasia Istanbul exhibition stands

General view of the Yeniler Etiket stand during Eurasia Packaging 2025: a green brand fascia on a dark body, timber display niches and meeting tables.

Come to Plast Eurasia with us and your stand arrives from our workshop in Beylikdüzü, the same district as Tüyap. Design, production, build and dismantling are ours; if you are bringing an injection moulding machine, its platform, power and delivery slot are planned by us as well. The stands we built in the same halls at the packaging fair are the closest example of what we do here.

What we do for you at Plast Eurasia

We draw the stand, produce it in our workshop in Beylikdüzü, build it at Tüyap with our own crew and take it down on closing night. The technical file for the hall management, the electricity and rigging applications, the graphic design and the print are ours too.

A plastics stand carries three kinds of product and each wants something different. For the machine we draw a reinforced floor platform, the right power supply and enough clear space for visitors to watch it running from a safe distance. For raw material we build a product wall where granules and sample boxes sit in their own light. For finished plastic goods we build a setting rather than a shelf; the right light and the right floor make even an ordinary product worth looking at.

Stands we have built at this fair

We do not yet have a published Plast Eurasia project, but we have work in the same halls for a closely related sector. In 2025 we built the 100 square metre custom timber stand for Yeniler Etiket at Eurasia Packaging, and in 2024 the 25 square metre maxima stand for Grossan. Both were at Tüyap for the packaging sector; the Eurasia Packaging page has the details.

Which stand type

  • Custom timber build: when the machine platform and the product wall are drawn as one piece and the surface has to be seamless; produced in the workshop, built at Tüyap in 2–5 days.
  • Maxima system: for small plots and short lead times; printed panels on an aluminium grid, built in 1–3 days, with the machine platform still produced in timber.
  • Island and corner stands: we put the machine at the corner where the open sides meet so that it is visible from both aisles.

Timeline for the 2026 edition

The fair runs 2–5 December 2026. We start 8 weeks out with the brief, the 3D visual and the budget; design approval and technical file at 6 weeks; workshop production and print files at 4 weeks; trial assembly and lighting test in the workshop at 1 week; build at Tüyap in fair week, handover walk the day before opening and dismantling at the close. If a machine is coming, its delivery day goes into the build plan from the start. For later starts we work out an accelerated programme. Send the fair name, floor area and number of open sides through the quote form; we reply within 48 hours, first concept free.

Plast Eurasia Istanbul 2026: 2–5 December 2026, Tüyap Fair and Congress Center, Istanbul. 12 weeks to go. Official fair site

Preparation timeline

  1. 7 October 20268 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 21 October 20266 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 November 20264 weeks before

    Production in the workshop; graphics and print files

  4. 25 November 20261 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 2 December 2026Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is Plast Eurasia Istanbul 2026?
Plast Eurasia Istanbul 2026 takes place 2–5 December 2026 at Tüyap Fair and Congress Center (Istanbul). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for Plast Eurasia Istanbul 2026 be ordered?
Starting by 7 October 2026 for a custom timber stand, or around 4 November 2026 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Can we run an injection moulding machine on the stand?
Yes. We take the machine's weight, dimensions, power rating and any other connection needs at quote stage. The platform is produced to carry it, the technical file correspondence with the hall management is ours, and we draw a safe clearance between the machine and the visitors.
How does the machine get into the hall, and who organises it?
We arrange the forklift slot and the entry gate with the hall management; the build plan states the day and hour the machine arrives. The platform is ready before that moment.
Are there height and rigging limits at Tüyap?
They are set out in the hall management's technical file for each fair. We follow that file and, where a tall structure or a hanging element is needed, obtain the approval on your behalf.
Who builds and dismantles the stand?
Our own crew. The stand goes through a trial assembly in Beylikdüzü and travels to Tüyap from there. We walk it together the day before opening and hand it over with a written guarantee; at the close we dismantle it while you collect your machine and samples.

Let us build your stand at Plast Eurasia Istanbul 2026

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs