Skip to content
Akros Mimarlık
TR

Trade fair

Gulfood Manufacturing exhibition stands

The buyer who walks onto your stand at Gulfood Manufacturing wants to see the line running, the pack closing, the ingredient flowing. We build the stand around the machine and the tasting counter: power, water and drainage are the first step of the plan. Dubai World Trade Centre has 17 halls and 105,000 square metres; once we know your hall we work out the build sequence from the loading gate.

What we do for you at Gulfood Manufacturing

We draw the stand in Beylikdüzü and send a three-dimensional visual for approval. Production is in our own workshop: stainless-look counters, washable surfaces and a tasting bar suitable for food contact are made there and go through a trial assembly. Then dispatch: freight, temporary import documents and Dubai customs are ours. We handle the technical file, the power and water orders with the hall management. Our own crew builds the stand and dismantles it on the evening of 5 November.

If your machine will run, we ask for its power rating, its product feed and its noise level; the flooring and guard rail around it are completed once the machine is in position. If there will be tasting, a small preparation area with a fridge and a sink goes behind the counter. Our Dubai page explains how we operate in the city and carries the fair calendar.

Stands we have built at food and packaging fairs

A manufacturer heading to Dubai usually looks at our packaging work first: the 100 square metre timber stand we built for Yeniler Etiket at Eurasia Packaging 2025 and the Grossan Eurasia Packaging 2024 Istanbul stand, a 25 square metre maxima. For a stand with running machinery the Emintosun LIGNA 2025 Hanover exhibition stand is a good reference: a 182 square metre maxima stand. Our food and beverage and packaging pages list further work.

Which stand type for Gulfood Manufacturing

  • Maxima system: 12–200 square metres, built in 1–3 days; our first choice when the build window in Dubai is short.
  • Custom timber build: for stands with a tasting bar and a preparation kitchen; 20–500 square metres, 2–5 build days.
  • Country pavilion: when several companies exhibit together, with a shared kitchen and shared meeting area; above 100 square metres, 4–10 build days.

Schedule

The fair runs 3–5 November 2026. A comfortable programme: brief, first concept and budget on 8 September; design approval and technical file on 22 September; workshop production and print on 6 October; trial assembly and dispatch on 27 October. Build in the hall during fair week, handover walk on 2 November, dismantling on the evening of 5 November. Heavy material going to Dubai by sea is dispatched earlier, so if the date is close write to us today and we tell you the same day what can still be done. The quote form is here.

Gulfood Manufacturing 2026: 3–5 November 2026, Dubai World Trade Centre, Dubai. 7 weeks to go. Official fair site

Preparation timeline

  1. 8 September 20268 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 22 September 20266 weeks before

    Design approval, technical file submitted to the organiser

  3. 6 October 20264 weeks before

    Production in the workshop; graphics and print files

  4. 27 October 20261 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 3 November 2026Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is Gulfood Manufacturing 2026?
Gulfood Manufacturing 2026 takes place 3–5 November 2026 at Dubai World Trade Centre (Dubai). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for Gulfood Manufacturing 2026 be ordered?
Starting by 8 September 2026 for a custom timber stand, or around 6 October 2026 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Can we offer product tasting on the stand?
Yes. A sink, a fridge and a preparation counter go behind the bar; we order the water and drainage connection from the hall management. Tasting rules are confirmed with the organiser in advance.
Our machine will run on the stand. Are power and noise a problem?
We declare the machine's power rating in the technical file and place the connection point next to it on the plan. Noise limits are followed according to the hall rules; where needed we draw a sound-absorbing wall behind the machine.
How does customs work in Dubai?
The stand and your samples travel on temporary import documents and we run the customs process. If food samples are involved we ask for the list early; some categories need separate paperwork and we put that into the schedule from the start.
Who builds the stand and how long does it take?
Our own crew. A maxima stand takes 1–3 days, a timber stand 2–5 days; we follow the hall's build hours. The handover walk is done together the day before opening.
Can the stand have a closed meeting room?
Yes. On most Gulfood Manufacturing stands we draw a closed room for buyer meetings with a lockable cupboard for samples and price lists; walls and door are produced in the workshop and arrive with the stand.

Let us build your stand at Gulfood Manufacturing 2026

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs