
Er BakırMining
Er Bakır Interwire 2025 Atlanta exhibition stand
54 m²2025AtlantaInterwire
Trade fair

For a wire or copper producer travelling from Turkey to Interwire, the big question is not the stand but how it crosses the ocean. We did exactly that for Er Bakır in 2025: produced the stand in our workshop in Beylikdüzü, shipped it to Atlanta under an ATA Carnet, built it at the Georgia World Congress Center with our own crew and dismantled it when the show closed. We walk the same route for you, under one contract and with one contact.
We take your floor area and sample list and draw a three-dimensional concept; after approval we send the technical file to the hall management at the Georgia World Congress Center. At US shows the rules on hall labour and build hours work differently from Europe; we follow those rules and plan around them. Freight, customs, build, dismantling and return freight sit in one contract. Graphics and print are ours.
Copper and wire samples are heavy. Coil plinths are drawn with steel reinforcement and the load is shown on the plan. Section samples and wire gauges go into lit showcases, certificates onto a legible wall area. American buyers tend to keep conversations short and standing, so bar tables and quick meeting points take more room in the plan and the closed room gets smaller.
In 2025 we built the 54 square metre custom timber stand for Er Bakır; the freight from Istanbul to Atlanta was ours, and the project page carries fourteen images. For the Istanbul fair of the same product group see our wire Eurasia page; our other work in the country is on the United States page.
The next edition runs 4–6 May 2027. A comfortable programme starts on 9 March 2027 with the brief, concept and budget; design approval and technical file on 23 March, workshop production and print files on 6 April, trial assembly in the workshop on 27 April. For transatlantic freight we pull the shipping date forward, which is why we ask you to start earlier than 8 weeks for a US show. Build in the hall during show week, a walk-through on 3 May, dismantling on the evening of 6 May. Put your floor area and sample list into the quote form; we reply within 48 hours and the first concept is free.
Interwire 2027: 4–6 May 2027, Georgia World Congress Center, Atlanta. 29 weeks to go. Official fair site
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote