
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Industry
On a medical stand the device is switched on, a clinician or a buyer is standing at it and a demonstration is under way. We build the stand for the demonstration: a hidden power line to the base of the device, a clean floor with no visible cable, room for two or three people around the unit, and an examination couch or a patient room layout where one is needed. Surfaces are white and wipe-clean, because a medical buyer reads the stand the way they read the product.
We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and dismantle it when the fair closes. The power application, and a water application where needed, goes to the hall management from us; graphics, print and the technical file are ours. For fairs abroad we run the stand freight, the ATA Carnet and customs. Your devices arrive separately on their own export and certification papers, and their placement is written into our build-up programme.
Two things are settled early on a medical stand: order and privacy. Consumables and small devices go into lockable cabinets, the large unit into the demonstration area, dealer talks into a closed room. The floor is raised so no cable shows and the socket sits directly under the device. Lighting is white and shadow-free, angled away from any screen so it does not reflect.
MEDICA at Messe Düsseldorf runs on 16–19 November 2026; our Aachen office gives support on the German side, with the stand freight and customs handled by us. For medical fairs in Istanbul the CNR Expo and Tüyap halls are described on our Istanbul page. Similar work that asked for clean surfaces and a closed meeting room is on our chemicals page: we built the 100 square metre timber stand for İba Kimya at PaintExpo 2024 in Karlsruhe.
Fair name, dates, floor area and number of open sides; within 48 hours you get a free first concept in three dimensions and a written budget in three options, scope itemised. Start 8 weeks before the fair: design approval and technical file at 6 weeks, workshop production at 4, trial assembly and lighting test at 1. Put the dimensions and power rating of the devices in the brief; the demonstration area and the supply are drawn to them. The quote form is here.
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

EvafoneTechnology
12 m²2026IstanbulPetzoo Eurasia

Er BakırMining
54 m²2025AtlantaInterwire

Yeniler EtiketPackaging
100 m²2025IstanbulEurasia Packaging Istanbul
Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.
Request a quote