Skip to content
Akros Mimarlık
TR

Trade fair

Salone del Mobile.Milano exhibition stands

At Salone your product is the furniture, and the stand must neither fade beside it nor upstage it. We settle that with floor, light and ceiling: the right floor under the sofa, the right light above it, a calm wall behind it that does not shift the colour of the fabric. Fiera Milano has 8 halls and 345,000 square metres; we take the aisle your plot faces into account and draw the layout around it.

What we do for you at Salone del Mobile

We treat the stand as a showroom. Living, dining and bedroom scenes are drawn around your collection, and we always add a closed meeting room where you can sit down with dealers and open a price list. Production happens in our own workshop in Beylikdüzü: timber walls, concealed light strips, niches and shelves painted in the tone of your product are made there and assembled once for a trial.

Then it all travels to Milan on our lorry. Freight, the ATA Carnet and customs are ours; your furniture can go on the same lorry so that only one customs file is opened. We handle the technical file with Fiera Milano, the power order and the rigging application. Our own crew builds the stand and dismantles it on the evening of 18 April.

Stands we have built at furniture fairs

A brand heading to Salone usually looks first at the 28 square metre timber stand we built for Doqu Home at imm cologne 2023; on a small plot we favour a timber build for its uninterrupted surfaces. Our furniture page lists the rest of our work in the sector. We also work with the same crew at the Istanbul Furniture Fair and at imm cologne; for brands that attend all three in one season we design once and produce a fresh build for each fair.

Which stand type for Salone

  • Custom timber build: our first choice for a furniture stand; seamless walls, painted surfaces, recessed light, 20–500 square metres, 2–5 build days in the hall.
  • Island and corner stands: on plots with two or four open sides we arrange the scenes to face the aisles; 36–800 square metres, 3–6 build days.
  • Double-decker stand: dealer meetings upstairs, the collection downstairs; we suggest it above 60 square metres, build 4–8 days.

Schedule

The fair runs 13–18 April 2027. A comfortable programme: brief, first concept and budget on 16 February; design approval and technical file on 2 March; workshop production and print on 16 March; trial assembly, lighting test and dispatch on 6 April. Build in the hall during fair week, handover walk on 12 April, dismantling on the evening of 18 April. If your collection is only final in March, we draw the stand first and update the product placement in the last two weeks. The quote form is here; we reply within 48 hours.

Salone del Mobile.Milano 2027: 13–18 April 2027, Fiera Milano, Milan. 30 weeks to go. Official fair site

Preparation timeline

  1. 16 February 20278 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 2 March 20276 weeks before

    Design approval, technical file submitted to the organiser

  3. 16 March 20274 weeks before

    Production in the workshop; graphics and print files

  4. 6 April 20271 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 13 April 2027Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is Salone del Mobile.Milano 2027?
Salone del Mobile.Milano 2027 takes place 13–18 April 2027 at Fiera Milano (Milan). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for Salone del Mobile.Milano 2027 be ordered?
Starting by 16 February 2027 for a custom timber stand, or around 16 March 2027 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
How do you light the stand without shifting the colour of the furniture?
We plan the lighting from your product photographs and test fabric and timber tones under real light in the workshop. We ask you to come to the trial assembly; the colour temperature is fixed there together.
Can you rig from the ceiling?
We submit the rigging application to the hall management and declare the points and loads in the technical file. Until approval arrives we draw the ceiling element with a floor-standing alternative, so the plan does not change if approval is late.
Do you transport our furniture as well?
We can. Stand and product travel on the same lorry, one ATA Carnet is opened, and everything enters the hall in one delivery. Unsold pieces return on the same document after the fair.
Can the stand have a closed meeting room?
Yes, we draw one on almost every Salone stand. A room with a table for opening the sample book with dealers, a small kitchen niche and a lockable cupboard; door and walls are produced in the workshop.
Who builds and dismantles the stand?
Our own crew, the same people who assembled it in the workshop. We follow Fiera Milano's build hours; you arrive for the handover walk the day before opening and leave the dismantling to us.

Let us build your stand at Salone del Mobile.Milano 2027

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs