Skip to content
Akros Mimarlık
TR

Trade fair

Istanbul Furniture Fair (IIFF) exhibition stands

General view of the Yeniler Etiket stand during Eurasia Packaging 2025: a green brand fascia on a dark body, timber display niches and meeting tables.

Building a stand for a furniture manufacturer is a particular test for us, because the client knows timber as well as we do. So on the stands we draw for the Istanbul Furniture Fair the joints are hidden, the floors are real and the light falls from the ceiling onto the product. We produce the stand in our workshop in Beylikdüzü; Tüyap is in the same district.

What we do for you at the Istanbul Furniture Fair

We draw the stand, produce it in our workshop in Beylikdüzü, build it at Tüyap with our own crew and dismantle it at the close. The technical file for the hall management, the electricity and rigging applications, the graphics and the print are ours. Handover is the day before opening, with a written guarantee.

On a furniture stand the product is already good to look at; our job is to give it the right room. We split the collection into rooms, a living room, a bedroom or an office setting, and choose each room's floor, wall colour and lighting for the piece in it. We draw a route through the pieces that lets the visitor touch them, and add a closed room for dealer meetings with a kitchen corner behind it. On large plots a two-storey plan with the meeting rooms upstairs is a frequent choice.

Stands we have built at this fair

We do not yet have a published Istanbul Furniture Fair project on the site. For our timber work in the same halls, look at the 100 square metre custom stand we built for Yeniler Etiket in 2025; ten photographs show the joinery and surface quality. For furniture manufacturers we also have pages for imm cologne in Cologne, Salone del Mobile in Milan and, on the components side, Intermob. Our sector page is furniture.

Which stand type

  • Custom timber build: our first choice on a furniture stand; room settings, real flooring and ceiling lighting are produced in the workshop and built at Tüyap in 2–5 days.
  • Double-decker stand: on large plots we move the meeting rooms upstairs and leave the whole ground floor to the collection; the technical file correspondence with the hall management is ours.
  • Maxima system: for small plots and short lead times; built in 1–3 days.

Timeline for the 2027 edition

The fair runs 19–23 January 2027. We start 8 weeks out on 24 November 2026 with the brief, the 3D visual and the budget; design approval and technical file by 8 December; workshop production and print files by 22 December; trial assembly and lighting test in the workshop on 12 January; build at Tüyap in fair week, handover walk on 18 January and dismantling on the evening of 23 January. Because the new year holiday falls inside this schedule we suggest starting a week earlier. Send the fair name, floor area and number of open sides through the quote form; we reply within 48 hours, first concept free.

Istanbul Furniture Fair (IIFF) 2027: 19–23 January 2027, Tüyap Fair and Congress Center, Istanbul. 18 weeks to go. Official fair site

Preparation timeline

  1. 24 November 20268 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 8 December 20266 weeks before

    Design approval, technical file submitted to the organiser

  3. 22 December 20264 weeks before

    Production in the workshop; graphics and print files

  4. 12 January 20271 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 19 January 2027Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is Istanbul Furniture Fair (IIFF) 2027?
Istanbul Furniture Fair (IIFF) 2027 takes place 19–23 January 2027 at Tüyap Fair and Congress Center (Istanbul). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for Istanbul Furniture Fair (IIFF) 2027 be ordered?
Starting by 24 November 2026 for a custom timber stand, or around 22 December 2026 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Are the floor and the ceiling of the stand really built?
Yes. We lay parquet, carpet or whatever finish you choose on a platform; the ceiling is closed where the lighting needs it and spotlights follow the product layout. We test the light with your own pieces at the trial assembly.
What does a double-decker stand require?
A plot that suits it and the hall management's approval. We run the technical file correspondence with the hall; meeting rooms go upstairs, the collection downstairs. The build takes longer than a single-storey stand and the schedule is set accordingly.
What are the build hours and height rules at Tüyap?
They are set out in the hall management's technical file for each fair. We follow that file and, where a tall structure or rigging is needed, obtain the approval on your behalf.
Who builds the stand, and when do our pieces go in?
Our own crew builds and dismantles it. The stand is ready the day before the handover walk; the delivery slot for your pieces goes into the build plan from the start and we arrange any forklift need with the hall management.

Let us build your stand at Istanbul Furniture Fair (IIFF) 2027

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs