Skip to content
Akros Mimarlık
TR

Trade fair

SHOT Show exhibition stands

The distributor who walks onto your stand at SHOT Show wants to hold the product, feel the grip, see the mechanism. We build the stand for that: locked display cases, a product wall, a counter for handling and a closed meeting room at the back. We travel from Beylikdüzü to the Venetian Expo in Las Vegas; because it is an overseas job we start the schedule earlier than for any European fair.

What we do for you at SHOT Show

We draw the stand in Beylikdüzü and send a three-dimensional visual for approval. Production is in our own workshop: the locked cases, the product wall and the closed room are made there and go through a trial assembly. Then dispatch: freight, the ATA Carnet and customs are ours. The entry of your products into the United States follows its own regulations; we plan that side together with your export adviser and ship the stand material on a separate document. We handle the technical file and the power order with the Venetian Expo and follow the hall's and the organiser's build rules as written. Our own crew builds the stand and dismantles it on the evening of 22 January.

Stand (booth) culture in America differs from Europe: open sides instead of closed walls, a tall brand tower, a long display case facing a narrow aisle. We draw with that in mind; our United States page explains how we operate there.

Stands we have built at firearms fairs

A manufacturer heading to Las Vegas usually looks first at the 60 square metre maxima stand we built for Ağaoğlu Silah at IWA OutdoorClassics 2025 in Nuremberg; the stand was produced in Beylikdüzü and its freight and customs were ours. In Istanbul there is the Yazıcılarav 2025 Istanbul exhibition stand, a 60 square metre maxima at the Prohunt fair. For our US experience see the Er Bakır Interwire 2025 Atlanta exhibition stand: a 54 square metre timber build shipped from Beylikdüzü to Atlanta. The firearms page lists the rest of our work in the sector.

Which stand type for SHOT Show

  • Maxima system: 12–200 square metres, built in 1–3 days; light and compact for overseas freight, so it is our first choice.
  • Custom timber build: for stands built around locked cases and a closed room; 20–500 square metres, 2–5 build days.
  • Portable stand: 4–20 square metres, built in one day; a light solution that flies with you, for brands exhibiting for the first time.

Schedule

The fair runs 19–22 January 2027. A comfortable programme: brief, first concept and budget on 24 November; design approval and technical file on 8 December; workshop production and print on 22 December; trial assembly and dispatch on 12 January. Build in the hall during fair week, handover walk on 18 January, dismantling on the evening of 22 January. Because the schedule crosses the year-end holidays and sea freight is long, heavy material leaves at the beginning of December; that is why we prefer to talk about SHOT Show before November. The quote form is here.

SHOT Show 2027: 19–22 January 2027, Venetian Expo, Las Vegas. 18 weeks to go. Official fair site

Preparation timeline

  1. 24 November 20268 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 8 December 20266 weeks before

    Design approval, technical file submitted to the organiser

  3. 22 December 20264 weeks before

    Production in the workshop; graphics and print files

  4. 12 January 20271 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 19 January 2027Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is SHOT Show 2027?
SHOT Show 2027 takes place 19–22 January 2027 at Venetian Expo (Las Vegas). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for SHOT Show 2027 be ordered?
Starting by 24 November 2026 for a custom timber stand, or around 22 December 2026 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Can you show the products in locked display cases?
Yes. The cases are produced in the workshop and delivered with locks and interior lighting. We follow the organiser's display rules; you tell us the safety requirements of the product and we draw the case accordingly.
Does the build crew travel from Turkey to Las Vegas?
The crew that assembled the stand in the workshop builds it in Las Vegas as well. We apply the hall's and the organiser's labour and build rules as written; where local labour is required we organise it and list it as a separate item in the budget.
When should our stand leave Turkey?
Material going by sea leaves at the beginning of December; graphics and light parts going by air leave at the beginning of January. We plan both to enter the Venetian Expo on the same day.
Do you prepare the graphics separately for the US market?
Yes. You supply the texts and we prepare the English print files, converting units and warning texts to the form expected there. Printing is done in Beylikdüzü and the graphics ship with the stand.

Let us build your stand at SHOT Show 2027

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs