
SolinvedEnergy
Solinved 2025 Istanbul exhibition stand
110 m²2025IstanbulSolarEX Istanbul
Trade fair

A solar panel on a stand is either hung on a wall or set on a tilted rack; either way there is weight and a glass surface to deal with. When we draw for SolarEX we treat the panel as a structural element first and then position the lighting so that it does not bounce off the glass. In 2025 we built the 110 square metre custom timber stand for Solinved at CNR Expo.
We draw the stand, produce it in our workshop in Beylikdüzü, build it at CNR Expo with our own crew and dismantle it at the close. The technical file for the hall management, the electricity and rigging applications, the graphics and the print are ours.
An energy stand carries three product groups and each wants a different surface. For panels we produce a tilted rack or a reinforced wall fixing; for inverters and charging units we draw a product wall with the cables running inside it; for mounting systems we build a roof section that shows the product fitted on a real profile. A closed room for dealer and investor meetings with a kitchen corner behind it is usual; on large plots the meeting rooms can go upstairs.
In 2025 we built the 110 square metre custom timber stand for Solinved; on a plot that size we recommend custom timber for its seamless surfaces and free dimensions. In the same halls we built maxima stands for Hongfa and Eonus at EV Charge Show 2025. Our sector page is energy; for fairs abroad we work with freight and customs included at Intersolar Europe in Munich and Middle East Energy in Dubai.
The next fair runs 7–9 April 2027 at CNR Expo. We start 8 weeks out on 10 February 2027 with the brief, the 3D visual and the budget; design approval and technical file by 24 February; workshop production and print files by 10 March; trial assembly and lighting test in the workshop on 31 March; build at CNR in fair week, handover walk on 6 April and dismantling on the evening of 9 April. Panel reflection under the lights is tested with the real product at the trial assembly. For later starts we work out an accelerated programme. Send the fair name, floor area and number of open sides through the quote form; we reply within 48 hours, first concept free.
SolarEX Istanbul 2027: 7–9 April 2027, CNR Expo Istanbul, Istanbul. 25 weeks to go. Official fair site
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote