Skip to content
Akros Mimarlık
TR

Trade fair

Turkcoat / paintistanbul exhibition stands

General view of the Evafone stand at the fair 2026 in Istanbul: a 12 sqm maxima system build.

If the colour is wrong on a paint stand, nothing else matters. When we draw for Turkcoat the first decision is the light: sample panels go under shadow-free lighting close to daylight, against a neutral background. The fair runs every two years, which gives a comfortable lead time; we know CNR Expo from the three stands we built there in 2025.

What we do for you at Turkcoat

We draw the stand, produce it in our workshop in Beylikdüzü, build it at CNR Expo with our own crew and take it down at the close. The technical file for the hall management, the electricity and rigging applications, the graphics and the print are ours.

On a coatings producer's stand the product is a surface. We produce the colour card wall with recesses cut to the card size and run a hanging rail for painted sample panels, so that panels can be swapped during the fair. If you are on the raw material side, sample bottles go onto backlit shelves. If you plan a live application demonstration, we ask the hall management about washable flooring and ventilation at the start. We keep the meeting table close to the sample wall, so that a visitor can reach out and touch a panel mid-conversation.

Stands we have built at this fair

We do not yet have a published Turkcoat project on the site. Our work in the same halls includes the 110 square metre custom timber stand for Solinved at SolarEX 2025, the 25 square metre maxima stand for Eonus at EV Charge 2025 and the 60 square metre maxima stand for Yazıcılarav at Prohunt 2025. We also build for TURKCHEM Eurasia; for the European paint fairs see our European Coatings Show and PaintExpo pages. Our sector page is chemicals.

Which stand type

  • Custom timber build: when the colour wall should sit on a seamless surface at the brand's own proportions; produced in the workshop, built in 2–5 days.
  • Maxima system: for small plots and short lead times; printed panels on an aluminium grid with timber card recesses added, built in 1–3 days.
  • Island and corner stands: colour wall on the open side, meeting corner at the back.

Timeline for the 2027 edition

The next fair runs 24–26 November 2027. We start 8 weeks out on 29 September 2027 with the brief, the 3D visual and the budget; design approval and technical file by 13 October; workshop production and print files by 27 October; trial assembly and lighting test in the workshop on 17 November; build at CNR in fair week and the handover walk on 23 November. Join the lighting test at the trial assembly with your own colour samples; how a panel reads under the light is decided there, not in the hall. Send the fair name, floor area and number of open sides through the quote form; we reply within 48 hours, first concept free.

Turkcoat / paintistanbul 2027: 24–26 November 2027, CNR Expo Istanbul, Istanbul. 63 weeks to go. Official fair site

Preparation timeline

  1. 29 September 20278 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 13 October 20276 weeks before

    Design approval, technical file submitted to the organiser

  3. 27 October 20274 weeks before

    Production in the workshop; graphics and print files

  4. 17 November 20271 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 24 November 2027Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is Turkcoat / paintistanbul 2027?
Turkcoat / paintistanbul 2027 takes place 24–26 November 2027 at CNR Expo Istanbul (Istanbul). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for Turkcoat / paintistanbul 2027 be ordered?
Starting by 29 September 2027 for a custom timber stand, or around 27 October 2027 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
How do you build the colour card wall?
In timber, with recesses cut to the card size, so that cards can be changed during the fair. The lighting uses shadow-free fittings with a fixed colour temperature, and we test it with your own samples at the trial assembly.
Can we demonstrate paint application on the stand?
That depends on the hall management's rules; we handle the technical file correspondence and the required precautions. A demonstration corner gets washable flooring, ventilation and a power line in the plan from the start.
Who builds the stand at CNR Expo?
Our own crew. The stand goes through a trial assembly in Beylikdüzü and travels to CNR from there. We walk it together the day before opening, hand it over with a written guarantee and dismantle it at the close.
Is there any point in talking now about the next edition?
Yes. Once we know your floor area and number of open sides we draw the first concept and hold it; you update the product list as the date approaches and we open the technical file then. The first concept is free, so talking early costs you nothing.

Let us build your stand at Turkcoat / paintistanbul 2027

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs