
AlesConstruction Machinery
Ales 2023 Moscow exhibition stand
48 m²2023Moscow
Industry

On a construction machinery stand the product is measured in tonnes, and the visitor wants to walk up to the machine and climb into the cab. We build the stand around the machine: an open display area with a calculated floor load, a step or platform for access to the cab, a wall of attachments and spare parts for larger machines, and a closed room at the back for the sales conversation. The machine enters by forklift or on its own wheels, so the open side and the parking spot are drawn on the floor plan on day one.
We draw the stand, produce it in our own workshop in Beylikdüzü, build it with our own crew and take it down afterwards. Graphics and print are ours. The technical file for the hall and, for fairs abroad, the freight, ATA Carnet and customs are ours as well; the machine weight, its entry day and the power and compressed air needs go into that technical file.
On a machinery stand the build sequence decides everything: floor and plinth first, then the machine, then the walls close around it; we write the machine's entry day into the build schedule. Attachments, buckets and spare parts go on a steel-reinforced hanging wall, controls and electronics into a working screen niche. For a machine in the open-air area, canopy and floor covering are drawn separately.
In Germany, the next bauma Munich runs from 3 to 9 April 2028; in 2025 we built the 153 square metre maxima stand for GMS there; at German fairs our Aachen office supports on site. In Russia we built a 48 square metre timber stand for Ales at Crocus Expo Moscow in 2023; our Moscow page explains the freight and customs arrangement. In Turkey the construction machinery fairs are in Istanbul; our Istanbul page covers the build at Tüyap and CNR Expo. Building materials stands are on our construction page.
Send us the fair name and dates, your floor area, the number of open sides and the weight of the machine; we reply within 48 hours. The first concept is free, with a 3D visual; the written budget has three options, scope listed item by item. For a machinery stand we like to start 8 weeks before the fair, because the technical file correspondence with the hall about the machine takes time. The quote form opens here.
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.
Request a quote