Skip to content
Akros Mimarlık
TR

Trade fair

VIV MEA exhibition stands

The farm owner or integrator who walks onto your stand at VIV MEA wants to see the feed sample, open and close the poultry equipment by hand and sit down with you to talk tonnage. We build the stand for that: a sample wall, a solid platform for working equipment, a closed meeting room at the back. We travel from Beylikdüzü to ADNEC in Abu Dhabi; freight, temporary import and customs are our job.

What we do for you at VIV MEA

We draw the stand in Beylikdüzü and send a three-dimensional visual for approval. Production is in our own workshop: a glass jar wall for feed samples, a hanging system for feeders and drinkers, a chilled cabinet for vaccines and premixes are made there and go through a trial assembly. Then dispatch: freight, temporary import documents and Abu Dhabi customs are ours. We handle ADNEC's technical file, the power and water orders with the hall management and follow the hall rules as written. Our own crew builds the stand and dismantles it on the evening of 25 November.

We also work in the same sector at EuroTier in Hanover and AGROS Expo in Moscow; the stand is drawn and produced afresh for each hall and the freight is planned for that country. Our Abu Dhabi page explains how we operate in the city.

Stands we have built at livestock fairs

A manufacturer heading to Abu Dhabi usually looks first at the 40 square metre timber stand we built for Atlas Yem at AGROS Expo 2024 in Moscow; the stand was produced in Beylikdüzü and its freight and customs to Moscow were ours. For equipment-heavy stands the Emintosun LIGNA 2025 Hanover exhibition stand is a good measure: a 182 square metre maxima stand. Our livestock page lists further work in the sector.

Which stand type for VIV MEA

  • Maxima system: 12–200 square metres, built in 1–3 days; our first choice for feed and animal health stands that rely on product imagery.
  • Custom timber build: for equipment platforms, chilled cabinets and a closed room; 20–500 square metres, 2–5 build days.
  • Country pavilion: when several companies exhibit together, with a shared meeting area; above 100 square metres, 4–10 build days.

Schedule

The fair runs 23–25 November 2027. A comfortable programme: brief, first concept and budget on 28 September; design approval and technical file on 12 October; workshop production and print on 26 October; trial assembly and dispatch on 16 November. Build in the hall during fair week, handover walk on 22 November, dismantling on the evening of 25 November. Heavy equipment going by sea is dispatched in October. Write the fair name and your floor area into the quote form; we reply within 48 hours.

VIV MEA 2027: 23–25 November 2027, ADNEC, Abu Dhabi. 62 weeks to go. Official fair site

Preparation timeline

  1. 28 September 20278 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 12 October 20276 weeks before

    Design approval, technical file submitted to the organiser

  3. 26 October 20274 weeks before

    Production in the workshop; graphics and print files

  4. 16 November 20271 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 23 November 2027Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is VIV MEA 2027?
VIV MEA 2027 takes place 23–25 November 2027 at ADNEC (Abu Dhabi). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for VIV MEA 2027 be ordered?
Starting by 28 September 2027 for a custom timber stand, or around 26 October 2027 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
How do you present feed and premix samples on the stand?
We draw a back-lit sample wall with glass jars and leave room under each jar for the product label. Products that need a cold chain go into a chilled cabinet, and we order the power from the hall.
Can we show poultry equipment in working condition?
Yes. We ask for the weight and power rating of the equipment, draw a platform under it and declare the power and, if needed, water connection in the technical file. The hall's authorised contractor makes the connection.
How do customs and freight work for Abu Dhabi?
Stand and samples travel on temporary import documents and we run the process. Feed and veterinary samples may need separate paperwork; we take the list early and put it into the schedule from the start.
How many build days, and whose crew?
Our own crew builds: maxima in 1–3 days, timber in 2–5 days. We follow the hall's build hours and do the handover walk with you the day before opening.
Can the stand have a closed meeting room and a store?
Yes. On most VIV MEA stands we draw a closed room for contract talks and a lockable store for samples and catalogues; walls and door are produced in the workshop and arrive with the stand.

Let us build your stand at VIV MEA 2027

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs