Skip to content
Akros Mimarlık
TR

Trade fair

WIN EURASIA exhibition stands

General view of the Evafone stand at the fair 2026 in Istanbul: a 12 sqm maxima system build.

At WIN EURASIA the stand has one job: to show the machine running, safely and well lit. We draw stands for this fair around the machine: a floor sized for its weight, cable ducts, a barrier between visitors and moving parts, and a corner where a conversation can be held away from the noise. Production is in our workshop in Beylikdüzü; build and dismantling at CNR Expo are done by our own crew.

What we do for you at WIN EURASIA

We take your floor plan and machine list and draw a three-dimensional concept. After approval we send the technical file to the hall management at CNR Expo Istanbul and open the power and compressed air requests ourselves. Graphics and print are ours; machine images and specification tables are printed at a size that can be read from the aisle.

Machine delivery sets the schedule at this fair. A heavy machine has to be placed before the structure around it goes up, so we plan the build sequence around the delivery slot and show the forklift route on the plan. Once the machine is in position the walls, showcases and lighting are completed. If you run a live demonstration we fence off the moving zone and test the power line before the show opens.

Stands we have built at this fair

On the machinery and automation side we built the 42 square metre maxima stand for Trex at the Industry 4.0 Fair at CNR Expo in 2024. In Germany we built a 182 square metre maxima stand for Emintosun at LIGNA Hanover in 2025; our other machine-led work is on the machinery and industry page. For the machine tool fair at Tüyap there is our MAKTEK Eurasia page.

Which stand type

  • Maxima system: 12–200 square metres, built in 1–3 days; for stands that must be completed quickly once the machine is in.
  • Custom timber build: 20–500 square metres, 2–5 days; when you want uninterrupted surfaces and a form drawn for the brand.
  • Island and corner stands: 36–800 square metres, 3–6 days; to make the machine visible from all sides.

Timeline

The fair runs 2–5 June 2027. A comfortable programme starts on 7 April 2027 with the brief, concept and budget; design approval and technical file on 21 April, workshop production and print files on 5 May, trial assembly and lighting test in the workshop on 26 May. Build in the hall during fair week, a walk-through on 1 June, dismantling on the evening of 5 June. If you start later we first say what still fits, then switch to an accelerated programme. Put the fair name, your floor area and the machine list into the quote form; we reply within 48 hours.

WIN EURASIA 2027: 2–5 June 2027, CNR Expo Istanbul, Istanbul. 38 weeks to go. Official fair site

Preparation timeline

  1. 7 April 20278 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 21 April 20276 weeks before

    Design approval, technical file submitted to the organiser

  3. 5 May 20274 weeks before

    Production in the workshop; graphics and print files

  4. 26 May 20271 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 2 June 2027Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is WIN EURASIA 2027?
WIN EURASIA 2027 takes place 2–5 June 2027 at CNR Expo Istanbul (Istanbul). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for WIN EURASIA 2027 be ordered?
Starting by 7 April 2027 for a custom timber stand, or around 5 May 2027 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Who brings the machine to the stand, and how does it fit with the build?
The machine can be shipped by you or by us; we agree the hall entry slot together. The build sequence is planned around it: floor and structure first, walls and lighting after the machine is in position.
Can we get power and compressed air for a running machine?
Yes. We open the power and air requests with the hall management and show the cable duct on the plan. If the machine is loud, the meeting corner goes to the far end of the stand.
What do you need for floor load and forklift access?
The weight and dimensions of the machine. Give them to us at quote stage and we show floor load and the forklift route on the plan and obtain the hall management approval.
Who builds and dismantles the stand?
Our own crew. The stand goes through a trial assembly in the workshop and is built in the hall in one to five days depending on type. We dismantle on the closing evening and plan the machine's exit with you.

Let us build your stand at WIN EURASIA 2027

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs