
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Trade fair

At Petzoo Eurasia the plots are mostly small, the aisles are crowded and visitors want to pick the product up. So we draw the stand like a shop shelf: food and accessories at eye level, stock cupboards underneath, a tasting or trial table at the front and a table in the corner where orders are written down. The stand is produced in our own workshop in Beylikdüzü, built at CNR Expo by our own crew and dismantled after the fair.
The fair takes place at CNR Expo Istanbul, a venue with 11 halls and 98,000 square metres. The technical file, the electricity application, the graphics and the print are ours.
On a pet product stand the packaging is the brand. We choose shelf lighting at a colour temperature that does not distort the packaging colours and test it with your product during the trial assembly. If live animals or an aquarium are going to be shown, the water and electricity connections and the floor protection go into the plan from the start. With a large product range we divide the plot by product group and put a readable header panel above each; someone walking down a crowded aisle understands what you sell in three seconds.
In 2026 we built the 12 square metre maxima stand for Evafone; on a plot of that size we fit a product wall and a meeting table. It is a good example of the scale at this fair. Our livestock industry page lists the feed and equipment side, and the food and beverage page shows stands with tasting corners.
Petzoo Eurasia runs from 7 to 10 October 2026. For this year's fair the 8 and 6 week marks have passed, so we are working on an accelerated programme. The remaining dates: design approval and the start of workshop production by 9 September, the trial assembly and lighting test at the workshop on 30 September, build in the hall during fair week, the handover walk on 6 October and dismantling on the evening of 10 October. For next year's edition the comfortable programme is the brief 8 weeks before the fair, design approval at 6 weeks, production at 4 weeks and the trial assembly at 1 week. Put your floor area and the size of your product range into the quote form; we reply within 48 hours.
Petzoo Eurasia 2026: 7–10 October 2026, CNR Expo Istanbul, Istanbul. 4 weeks to go. Official fair site
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote