Skip to content
Akros Mimarlık
TR

Trade fair

Petzoo Eurasia exhibition stands

General view of the Evafone stand at the fair 2026 in Istanbul: a 12 sqm maxima system build.

At Petzoo Eurasia the plots are mostly small, the aisles are crowded and visitors want to pick the product up. So we draw the stand like a shop shelf: food and accessories at eye level, stock cupboards underneath, a tasting or trial table at the front and a table in the corner where orders are written down. The stand is produced in our own workshop in Beylikdüzü, built at CNR Expo by our own crew and dismantled after the fair.

What we do for you at Petzoo Eurasia

The fair takes place at CNR Expo Istanbul, a venue with 11 halls and 98,000 square metres. The technical file, the electricity application, the graphics and the print are ours.

On a pet product stand the packaging is the brand. We choose shelf lighting at a colour temperature that does not distort the packaging colours and test it with your product during the trial assembly. If live animals or an aquarium are going to be shown, the water and electricity connections and the floor protection go into the plan from the start. With a large product range we divide the plot by product group and put a readable header panel above each; someone walking down a crowded aisle understands what you sell in three seconds.

Stands we have built at this fair

In 2026 we built the 12 square metre maxima stand for Evafone; on a plot of that size we fit a product wall and a meeting table. It is a good example of the scale at this fair. Our livestock industry page lists the feed and equipment side, and the food and beverage page shows stands with tasting corners.

Which stand type

  • Maxima system: 12 to 200 square metres, built in the hall in 1–3 days. Our first recommendation for the small and medium plots at Petzoo; the Evafone stand is this type.
  • Modular stand: 9 to 150 square metres, built in 1–2 days. Suits product brands that want a lot of shelving and little wall.
  • Custom timber build: from 20 square metres, built in 2–5 days. For painted surfaces in your brand colour and shelving made to your product dimensions.

Timeline

Petzoo Eurasia runs from 7 to 10 October 2026. For this year's fair the 8 and 6 week marks have passed, so we are working on an accelerated programme. The remaining dates: design approval and the start of workshop production by 9 September, the trial assembly and lighting test at the workshop on 30 September, build in the hall during fair week, the handover walk on 6 October and dismantling on the evening of 10 October. For next year's edition the comfortable programme is the brief 8 weeks before the fair, design approval at 6 weeks, production at 4 weeks and the trial assembly at 1 week. Put your floor area and the size of your product range into the quote form; we reply within 48 hours.

Petzoo Eurasia 2026: 7–10 October 2026, CNR Expo Istanbul, Istanbul. 4 weeks to go. Official fair site

Preparation timeline

  1. 12 August 20268 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 26 August 20266 weeks before

    Design approval, technical file submitted to the organiser

  3. 9 September 20264 weeks before

    Production in the workshop; graphics and print files

  4. 30 September 20261 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 7 October 2026Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 1

All projects

Frequently asked

When and where is Petzoo Eurasia 2026?
Petzoo Eurasia 2026 takes place 7–10 October 2026 at CNR Expo Istanbul (Istanbul). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for Petzoo Eurasia 2026 be ordered?
Starting by 12 August 2026 for a custom timber stand, or around 9 September 2026 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
Have you built at Petzoo Eurasia before?
Yes; 1 of our stands are listed on this page. Each project states the year, floor area and stand type; we know the hall rules and build hours from that work.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
We only have a small plot. Is a built stand worth it?
The 12 square metre Evafone stand is the answer to exactly that question. On a small plot the wall goes to the product, the floor to conversation and the stock cupboard is hidden under the shelf. Our maxima system starts at 12 square metres.
Who places our products and stock on the stand?
We build the shelving and the cupboards, and if you wish we place the products together with you. The stock cupboard gets a lock, so your product stays closed throughout the fair.
Can we show live animals or an aquarium?
We follow the hall regulations for you; where a display needs permission, we submit the application to the hall management together with the technical file. Water and electricity connections and floor protection are drawn into the stand from the start.
How long does the build take and who does it?
Our own crew. A maxima system takes 1–3 days in the hall, a modular stand 1–2 days. The stand is assembled and tested once in the workshop before it travels to the hall; the day before opening we walk it together and hand it over with a written guarantee.

Let us build your stand at Petzoo Eurasia 2026

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs