Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builder in Berlin

For a company exhibiting in Berlin the hardest week is usually build-up: the venue is large, the delivery slots are fixed and the crew is in another country. We solve that from Istanbul. The stand is produced in our workshop in Beylikdüzü, assembled once for a trial, trucked to Germany and built at Messe Berlin by our own crew, with our Aachen office providing support on the German side during build-up week.

What we do at Berlin fairs

Messe Berlin has 26 halls and 160,000 square metres, so the hall you are placed in changes the freight and build-up plan directly; the moment the floor plan arrives we fix the truck gate and the delivery slot. The fair we follow is IFA Berlin; its dates and a preparation timeline are on the fair page. For a company showing consumer electronics or household appliances the main task is running the products live: the power load, the number of screens and devices and the counter detail that hides every cable are drawn from the start. The technology and information technology pages describe what we do on those stands.

We do not yet have a published project page from Berlin. For our stands in Germany see the İba Kimya stand at PaintExpo 2024 in Karlsruhe and the Ağaoğlu Silah stand at IWA 2025 in Nuremberg; freight, customs and build-up in Berlin follow the same routine.

Freight, customs and local support

The stand travels by truck in labelled crates; the exit from Turkey and the entry into Germany run on an ATA Carnet that we issue and follow. After the fair the dismantled stand returns to Turkey on the same carnet. We write the technical file for Messe Berlin, order electricity and internet, and apply for the rigging permit if anything hangs from the ceiling. Our Aachen office is on site during build-up week and provides the support on the German side. The truck leaves one week before the fair. Everything we do in the country is on the Germany stand page.

Which stand type for Berlin

  • Custom timber build: uninterrupted surfaces, hidden cable ducts, dimensions drawn for your brand; 2–5 days of build-up in the hall.
  • Maxima system: printed panels on an aluminium grid, built in 1–3 days; our first suggestion when the organiser allows few build-up days.
  • Double-decker stand: for companies that want the meeting room upstairs and the ground floor for product; we obtain the height approval.

Send the fair name and dates, your floor area and the number of open sides through the quote form; within 48 hours you receive a free first concept and a written budget in three options.

Fair venues in Berlin

  • Messe Berlin
    Halls
    26 halls
    Area
    160,000
    Fairs in calendar
    1 fairs in calendar

    Akros Mimarlık builds turnkey exhibition stands at Messe Berlin, produced in its own Istanbul workshop with freight and customs included. One contract covers IFA Berlin across the venue's 26 halls, ATA Carnet included; our Aachen office gives local support on the German side. The first concept is free, reply within 48 hours.

Working timeline for a fair in Berlin

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

Do you build at the fair venues in Berlin?
Yes: Messe Berlin. Hall rules vary by fair; we submit the technical file to the organiser.
When should a stand for Berlin be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Many devices will run on the stand. Who plans the electrics?
We do. You give us the number of devices and screens and the power rating of each; we calculate the load, enter it into the organiser's system and draw the sockets and cable ducts into the furniture. At build-up every device is switched on and handed over working.
When does the truck leave for Berlin?
Road freight leaves Beylikdüzü one week before the fair; that margin covers customs and the hall delivery slots. If you want your products on the same truck we add their list to the carnet.
Who deals with customs and the ATA Carnet?
We do. The parts list of the stand goes on the carnet and we follow the procedure at the Turkish exit and the German entry. After the fair the stand returns on the same carnet; there is nothing for you to prepare.
Is the build-up done by your own crew, and is language a problem?
Build-up and dismantling are done by the crew that produced the stand; our Aachen office provides support on the German side. We walk the stand with you the day before opening and hand it over in writing.

Let us build your stand at your fair in Berlin

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries