
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Trade fair
On an electronics stand every product is switched on and every one has a cable. When we draw for IFA the first job is to make the cable disappear: power running inside the product tables, connections gathered behind the screen wall, a table height at which a visitor can pick a product up and put it down safely. We produce the stand in Beylikdüzü and take it to Berlin ourselves.
We draw the stand, produce it in the workshop, run the trial assembly in Beylikdüzü and load the lorry. Fair logistics are ours: freight, ATA Carnet, customs on both sides, the technical file and the hall applications at Messe Berlin. Our Aachen office supports us on the German side and is your contact in build week. When the fair closes we dismantle the stand ourselves.
Messe Berlin has 26 halls and 160,000 square metres; your hall decides the lorry gate and the build slot, and we plan both from the start. The product is small but numerous, so we split the tables into groups and give each group its own light. The rigging and electrical applications for the screen wall are filed with the hall by us; the content on the screens is yours, the mounting and cabling ours. A closed room for press and dealer meetings and a lockable back room are our standard recommendation here.
We do not yet have a published IFA project. For our work in Germany, see the HANNOVER MESSE page: the maxima stands we built at Deutsche Messe for Genç Bombe in 2025, Öz Metal in 2023 and Tekno Vals in 2022 travelled the same freight and customs route. Our sector pages are information technology and technology; the Berlin page lists the other fairs in the city.
Trial assembly and dispatch fall on the same day, allowing for the lorry's days on the road. A comfortable schedule starts 8 weeks before the fair with the brief, the 3D visual and the budget; design approval and technical file at 6 weeks; workshop production and print files at 4 weeks; trial assembly and dispatch at 1 week; build at Messe Berlin in fair week, handover walk the day before opening, dismantling at the close. IFA runs every year at the beginning of September; the easiest route is to talk early about the next edition. Send the fair name, floor area and number of open sides through the quote form; we reply within 48 hours, first concept free.
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

EvafoneTechnology
12 m²2026IstanbulPetzoo Eurasia

Er BakırMining
54 m²2025AtlantaInterwire

Yeniler EtiketPackaging
100 m²2025IstanbulEurasia Packaging Istanbul
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote