
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Trade fair

What is sold at Intermob is not the furniture but the part that makes it furniture: the hinge, the runner, the handle, the panel, the edgeband, the fabric. Visitors want to take those parts in hand and open and close them. We draw the stand for that: working showcases that can be tried by hand, a wall where door samples are mounted on a real cabinet carcass, a surface where panel decors sit side by side. Production is in our workshop in Beylikdüzü; build and dismantling at Tüyap are done by our own crew.
We take your floor area and product groups and draw a three-dimensional concept; after approval we send the technical file to the hall management at Tüyap Fair and Congress Center. Showcases, the sample wall and the meeting area are produced in the workshop and go through a trial assembly. Graphics and print are ours.
At this fair the surface quality of the stand is judged as closely as the product, because your visitors read surfaces for a living. On a timber stand we build uninterrupted lacquered or veneered surfaces with no visible joints. For fabric and leather we draw hanging sample boards; for panel producers we draw lighting close to daylight so the decors read in their true colour. A lockable room behind the counter holds catalogues and sample stock for handing out.
On the furniture side we built the 28 square metre custom timber stand for Doqu Home at imm cologne in 2023; on a small plot we favour a timber build for its uninterrupted surfaces. In the same halls at Tüyap we built a 72 square metre timber stand for Karadağ İplik at Iplik Istanbul in 2025. All our work for the sector is on the furniture page; the Istanbul Furniture Fair in January and interzum in Cologne have their own pages.
This year's fair runs 17–20 September 2026, a little over two weeks away. Work coming in now can only run on an accelerated programme: design approval straight away, workshop production right after, trial assembly in the workshop on 10 September, build in the hall during fair week, a walk-through on 16 September, dismantling on the evening of 20 September. For next year's edition the comfortable programme starts 8 weeks before the fair with the brief, design approval at 6 weeks, workshop production at 4 weeks and trial assembly at 1 week. Put your floor area and product groups into the quote form; we reply within 48 hours and the first concept is free.
Intermob 2026: 17–20 September 2026, Tüyap Fair and Congress Center, Istanbul. 1 weeks to go. Official fair site
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, dispatch, ATA Carnet for abroad
Hall build, handover the day before opening, dismantling at close
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

EvafoneTechnology
12 m²2026IstanbulPetzoo Eurasia

Er BakırMining
54 m²2025AtlantaInterwire

Yeniler EtiketPackaging
100 m²2025IstanbulEurasia Packaging Istanbul
The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.
Request a quote