Skip to content
Akros Mimarlık
TR

Trade fair

Intermob exhibition stands

General view of the Yeniler Etiket stand during Eurasia Packaging 2025: a green brand fascia on a dark body, timber display niches and meeting tables.

What is sold at Intermob is not the furniture but the part that makes it furniture: the hinge, the runner, the handle, the panel, the edgeband, the fabric. Visitors want to take those parts in hand and open and close them. We draw the stand for that: working showcases that can be tried by hand, a wall where door samples are mounted on a real cabinet carcass, a surface where panel decors sit side by side. Production is in our workshop in Beylikdüzü; build and dismantling at Tüyap are done by our own crew.

What we do for you at Intermob

We take your floor area and product groups and draw a three-dimensional concept; after approval we send the technical file to the hall management at Tüyap Fair and Congress Center. Showcases, the sample wall and the meeting area are produced in the workshop and go through a trial assembly. Graphics and print are ours.

At this fair the surface quality of the stand is judged as closely as the product, because your visitors read surfaces for a living. On a timber stand we build uninterrupted lacquered or veneered surfaces with no visible joints. For fabric and leather we draw hanging sample boards; for panel producers we draw lighting close to daylight so the decors read in their true colour. A lockable room behind the counter holds catalogues and sample stock for handing out.

Stands we have built at this fair

On the furniture side we built the 28 square metre custom timber stand for Doqu Home at imm cologne in 2023; on a small plot we favour a timber build for its uninterrupted surfaces. In the same halls at Tüyap we built a 72 square metre timber stand for Karadağ İplik at Iplik Istanbul in 2025. All our work for the sector is on the furniture page; the Istanbul Furniture Fair in January and interzum in Cologne have their own pages.

Which stand type

  • Custom timber build: 20–500 square metres, built in 2–5 days; our first suggestion at this fair because of surface quality.
  • Maxima system: 12–200 square metres, 1–3 days; printed panels and showcases when the calendar is tight or the plot is small.
  • Island and corner stands: on open plots above 36 square metres the sample wall faces the aisle.

Timeline

This year's fair runs 17–20 September 2026, a little over two weeks away. Work coming in now can only run on an accelerated programme: design approval straight away, workshop production right after, trial assembly in the workshop on 10 September, build in the hall during fair week, a walk-through on 16 September, dismantling on the evening of 20 September. For next year's edition the comfortable programme starts 8 weeks before the fair with the brief, design approval at 6 weeks, workshop production at 4 weeks and trial assembly at 1 week. Put your floor area and product groups into the quote form; we reply within 48 hours and the first concept is free.

Intermob 2026: 17–20 September 2026, Tüyap Fair and Congress Center, Istanbul. 1 weeks to go. Official fair site

Preparation timeline

  1. 23 July 20268 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 August 20266 weeks before

    Design approval, technical file submitted to the organiser

  3. 20 August 20264 weeks before

    Production in the workshop; graphics and print files

  4. 10 September 20261 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 17 September 2026Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20500
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12200
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9150
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60600
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36800
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    1002000
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When and where is Intermob 2026?
Intermob 2026 takes place 17–20 September 2026 at Tüyap Fair and Congress Center (Istanbul). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for Intermob 2026 be ordered?
Starting by 23 July 2026 for a custom timber stand, or around 20 August 2026 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Do you build working showcases that visitors can open and close?
We do. Runner, hinge and handle samples are mounted on real doors and drawers, and the showcase is built with a carcass that stands up to a full day of opening and closing.
What lighting do you use for panel and veneer decors?
We draw lighting close to daylight that does not shift the colour of the decors. We suggest running the lighting test at the workshop trial assembly with your own samples.
What is needed for height and hanging signs at Tüyap?
Height and suspended loads need approval from the hall management; we prepare the technical file and obtain the approval. If you want a tall totem we start the approval process early.
Who builds and dismantles the stand?
Our own crew; 2–5 days for a timber stand, 1–3 for a maxima system. We dismantle on the closing evening as well, pack your samples and hand them back.

Let us build your stand at Intermob 2026

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs